Port-4

Rectification works for 160-m long Jetty in the Pussur River at Mongla, Khulna, Bangladesh

Assignment Name:

Rectification works for 160-m long Jetty in the Pussur River at Mongla, Khulna, Bangladesh

 

Name of Client:

Sena Kalyan Sangstha.

Location:

Mongla, Khulna Division, Bangladesh

Year of Completion:

January 2001

Project of Description:

The existing Jetty is one of the most important structures of Mongla Cement Factory (MCF). the Jetty was constructed in between 1994 to 1995. After construction of the Jetty started operation for Ocean going ship for loading and unloading purpose. Two years later MCF noticed some damage of the Jetty, which needed immediate remedial measures. The project included the renovation and modification works of the jetty which required repair/rehabilitation design solution from a reputed consultant.

Services Provided:

Review of existing Hydrological and Morphological Study and Jetty level, layout & alignment data. Checking of Detail structural analysis of the Jetty. Additional soil investigation and geotechnical Assessment. Detailed design, working and drawings for rehabilitation of the Jetty. Preparation of details cost estimate, bill of quantities.