SL No.
|
Project Name
|
Location
|
Duration
|
Name of Client
|
Read More
|
01 |
Hydrological and Morphological Study of 15 Bridges over Different River at Dhaka, Gopalganj, Rajbari, Kushtia, Shariatpur, Khulna, Bagerhat, Barishal,Patuakhali and Jhalokhati Districts under LGED.
|
Dhaka, Gopalganj, Rajbari, Kushtia, Shariatpur, Khulna, Bagerhat, Barishal, Patuakhali and Jhalokhati Districts under LGED.
|
2017 |
LGED
|
|
02 |
Feasibility Study & Detail Design of the “Amua Dhon River” and the adjoining areas for the proposed 180m Road Bridge over “Amua Dhon River” at Kathalia Upazila in Jhalakati District under RHD, Jhalakati Road Division, Jhalakati.
|
Jhalakati Road Division, Jhalakati. |
2011 |
RHD
|
|
03 |
Feasibility Study & Detail Design for Construction of Asulia-Birulia Link Road under Roads and Highway Department, Dhaka Road Circle, Dhaka.
|
Roads and Highway Department, Dhaka Road Circle, Dhaka. |
2010
|
RHD
|
|
04 |
Rehabilitation of Existing Meghna Bridge & Meghna-Gumti Bridge. |
Meghna-Gumti Bridge
|
2010
|
RHD
|
|
05 |
Construction of 1310m long Dapdapia Bridge on Barisal-Patuakhali Road, Barisal, Bangladesh.
|
Barisal-Patuakhali Road, Barisal, Bangladesh. |
2007 |
RHD
|
|
06 |
Consultancy Services for the Updating / Preparation of the Storm Water Drainage Master Plan for Dhaka City, IDA Credit No. 4506-BD
|
Dhaka |
2012 |
Wasa |
|
07 |
Supervision & Monitoring of Dredgingalong the Navigational Routes |
Bhairab to Chottogram |
2028 |
BIWTA |
|
08 |
Construction Supervision for riverbank protection project |
Vientiane Capital, Lao PDR |
2025 |
Ministry of Public Works and Transport |
|