{"id":1971,"date":"2019-02-20T12:41:46","date_gmt":"2019-02-20T12:41:46","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=1971"},"modified":"2026-07-26T08:34:57","modified_gmt":"2026-07-26T08:34:57","slug":"business-activities","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=1971","title":{"rendered":"Business Activities"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<table border=\"1\" width=\"1200\">\n<tbody>\n<tr>\n<td width=\"600\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-6498\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-161.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-161.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-161-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img decoding=\"async\" class=\"alignleft size-full wp-image-6499\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-111.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-111.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-111-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project: \u201cPreparation of Engineering Plan &amp; Detailed Structural Design &amp; Supervision for Construction of 4-lane City Flyover\u201d.<\/strong><\/p>\n<p style=\"text-align: center;\"><b>\u00a0Contract Signing with Rajshahi City Corporation (RCC) Date: 16th September 2015<\/b><\/p>\n<\/td>\n<td style=\"text-align: justify;\"><strong>Project: Design and Supervision of Construction of 20 Storied Commercial (Multifunctional) cum Residential Building named City Shapla Plaza &amp; 25 Storied Commercial cum Residential Building named City Padda Plaza in Narayanganj City.<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Narayanganj City Corporation.<br \/>\nDate: 27th December 2015<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-6501\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-131.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-131.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-131-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6502\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-142.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-142.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-142-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\"><b>Project: Design and Construction Supervision Consultancy Services for both end approach roads and 1Km Long Bridge over kaptai lake connecting Bagachari to Naniarchor Bridge, RANGAMATI.<\/b><\/p>\n<p style=\"text-align: center;\"><b><\/b><b>Contract Signing with 20 ECB.<br \/>\nDate: 16th May 2016<\/b><\/p>\n<\/td>\n<td><strong>Design and supervision Consultancy Services for Development of 19 Park and 12 Playground.<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Rajshahi City Corporation (RCC).<br \/>\nDate: 3rd August 2016<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6505\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-151.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-151.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/Untitled-151-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6851\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/1-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/1-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/1-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: justify;\"><strong>Project 1: Construction of Modern Slaughter House at Hazaribagh and Kaptan Bazar.<br \/>\nProject 2: Improvement of traffic management infrastructure (Intersection, Bus-stoppages\/ Bus-bay, Left lane, Guard rail, Traffic Sign, Grill, Fencing, LGED etc.).<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Dhaka South City Corporation.<br \/>\nDate: 3rd August 2016<\/strong><\/p>\n<\/td>\n<td>\n<p style=\"text-align: justify;\"><strong>Preparation &amp; submission of high-quality Environment-Friendly Master Plan for the &#8220;BEPZA Economic Zone&#8221; project, at Mirsaria, Chittagong.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Bangladesh Economic Zones Authority.<br \/>\nDate: 1st November 2016<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6854\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/2-2.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/2-2.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/2-2-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6856\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/3-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/3-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/3-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td><strong>Technical Discussion Meeting held in H.E Dr. Ivy Rahman, Mayor, Narayangonj City Corporation, good office regarding Kadam Rasul Bridge Alignment along with Project Director and LGED Officials.<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Date:19 July 2017<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"justify\"><strong>Annual General Meeting of the Bangladesh Association of Consulting Engineers (BACE) held in Lakeshore Hotel.<\/strong><\/p>\n<p align=\"center\"><strong>Date: 27th July 2017<\/strong><\/p>\n<p style=\"text-align: left;\" align=\"center\">\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6858\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/4-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/4-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/4-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6859\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/5-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/5-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/5-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Discussion for pre-proposal meeting in TEN Consultants&#8217; office in Bangkok,Thailand.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\">\n<\/td>\n<td>\n<p align=\"left\"><strong>Photo Session along with MAA Consultants Taiwan for pre-proposal meeting in MAA Consultants&#8217; office in Bangkok, Thailand.\u00a0<\/strong><\/p>\n<p style=\"text-align: left;\" align=\"center\">\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6861\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/6-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/6-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/6-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6862\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/7-1.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/7-1.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/7-1-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Technical Discussion along with TEN Consultants Thailand and Angel Lazaro Associates Philippines for the pre-proposal meeting in the JPZ Consulting office in Dhaka, Bangladesh.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Date:12 October 2017<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Photo Session along with TEN Consultants Thailand and Angel Lazaro Associates Philippines after pre-proposal meeting in JPZ Consulting office in Dhaka, Bangladesh.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Date:12 October 2017<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6864\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/8.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/8.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/8-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6865\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/9.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/9.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/9-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Photo Session along with TCL Consultants, Malaysia.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\">\n<\/td>\n<td>\n<p align=\"left\"><strong>Photo Session along with TEN Consultants Thailand and Angel Lazaro Associates Philippines after pre-proposal meeting in JPZ Consulting office in Dhaka, Bangladesh.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Bangladesh Railway<br \/>\nDate:13th February 2018<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6867\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/10.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/10.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/10-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6868\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/11.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/11.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/11-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project: Technical Construction of 02-Nos Slipway each 2000 M.T. (Max) at Dockyard no 1 &amp; 2 of BIWTC, Narayangonj.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Bangladesh Inland Water Transport Corporation (BIWTC)<br \/>\nDate:30th September 2019<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Project: Prepare Architectural Plan &amp; detailed Engineering Design &amp; Drawing, including other incidental works for the construction of 19 nos. of different structures, under the Project Integrated Urban Infrastructure Development in Rajshahi City Bangladesh.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Rajshahi City Corporation (RCC)<br \/>\nDate:20 May 2021<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6519\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus3.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6873\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/12.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/12.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/12-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project: Design Review and construction supervision for the construction of Bridge at 17 th KM on the Kachua-Betagi-Patuakhali-Lohalia-Kalayia Road over the River Paira<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Bangladesh Bridge Authority (BBA)<br \/>\nDate:27th June 2021<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Rajshahi City Corporation Infrastructure Project. Kickoff meeting in Vistara architect&#8217;s office .\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Rajshahi City Corporation (RCC)<br \/>\nDate: June 2021<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6522\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus5.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6526\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus8.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project:Design and Supervision of Sustainable Coastal and Marine Fisheries Project.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Department of Fisheries (DOF)<br \/>\nDate:04 August 2021<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Project:Rajshahi S upervision &amp; monitoring of performance-based dredging contracts with maintenance dredging and installation &amp; maintenance of navigational Aids along the navigational routes, the contract (Dredging in Chittagong-Dhaka-Ashuganj IWT corridor along with associated linked routes and construction of terminal with Allied facilities.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Bangladesh Inland Water Transport Authority (BIWTA)<br \/>\nDate: 21 September 2022<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6528\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus9.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6878\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/14.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/14.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/14-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project:Detailed Design of Architectural, Structural, Equipment &amp; Utilities, including Cost Estimate and Construction Supervision for the Project of &#8220;Establishment\u00a0\u00a0 of Inland Container and Bulk Terminal at Khanpur, Narayangonj.<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Bangladesh Inland Water Transport Authority (BIWTA)<br \/>\nDate:05 January 2023<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>A meeting was held in the authority&#8217;s conference room with the Honorable Chairman, Member (Finance), Member (Engineering), and other officials, along with foreign and national consultants, to discuss the Inception Report of the &#8220;Construction of an Inland Container and Bulk Terminal at Khanpur, Narayanganj&#8221;.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong><br \/>\nDate: March 2023<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6881\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/15.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/15.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/15-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6882\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/16.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/16.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/16-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project:Meeting with Experts from Egypt for the BBA Paira Bridge .<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong><br \/>\nDate:June 2023<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Project:A Development of Bhulta-Arihazar-Nabinagar-Shibpur-Radhika (R-203)(Korikhandi to Bancharampur-Nabinagan) Regional Highway and Sarail-Nasirnagar-Lakhai (R-220)(Sarail to Bolovodro Bridge)Regional Highway under Road Division Barahmanbaria during the year 2023-2024.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with\u00a0 Roads and Hoighway Department (RHD)<br \/>\nDate: 26 February 2024<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6884\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/17.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/17.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/17-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6533\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus12.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>In-house meeting with GPH ISPAT .<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong><br \/>\nDate:August 2024<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Project: Study on Social and Environmental Impacts after Implementation of the Meghna-Dhonagoda\u00a0\u00a0 Irrigation\u00a0\u00a0 Project (MDIP), BWDB.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing Water Development Board<br \/>\nDate: 16 January 2025<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6536\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/bus14.gif\" alt=\"\" width=\"600\" height=\"300\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6886\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/18.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/18.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/18-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Project: Design of Surface Water treatment plant, Booster Pump House with pump, transformer &amp; retaining wall, Pipe Network and Solid Waste Management System at Sajak of Rangamati District .<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Contract Signing with Department of Public Health Engineering (DPHE)<br \/>\nDate:24 July 2025<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Mou Signing with SEOHYUN Co., Ltd., South Korea, regarding future scope, especially the Rail-cum-Road Bridge across the Karnaphuli River at Kalurghat Point.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong><br \/>\nDate: July 2025<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6889\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/19.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/19.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/19-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<td width=\"600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-6890\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/20.jpg\" alt=\"\" width=\"600\" height=\"300\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/20.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/07\/20-300x150.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>Meeting for the Chairman, MPA, along with LAMOR, Finland. For the Establishment of the Modern Waste and Spilled Oil Management Project at Mongla Port .<br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong><\/p>\n<p><\/strong><\/p>\n<\/td>\n<td>\n<p align=\"left\"><strong>Project: Proof Checking Consultancy (PCC) Services for Construction of Mirganj Bridge over the Arial Kha River at 8th Kilometer of Rahmatpur-Babuganj-Muladi-Hizla Highway (Z-8034) project.\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\" align=\"center\"><strong>Contract Signing with Roads and Highways Department (RHD)<br \/>\nDate: 20 May 2026<\/strong><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; &nbsp; Project: \u201cPreparation of Engineering Plan &amp; Detailed Structural Design &amp; Supervision for Construction of 4-lane City Flyover\u201d. \u00a0Contract Signing with Rajshahi City Corporation (RCC) Date: 16th September 2015 Project: Design and Supervision of Construction of 20 Storied Commercial (Multifunctional) cum Residential Building named City Shapla Plaza &amp; 25 Storied Commercial cum Residential Building [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1971","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/1971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1971"}],"version-history":[{"count":127,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/1971\/revisions"}],"predecessor-version":[{"id":6892,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/1971\/revisions\/6892"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}