{"id":2014,"date":"2019-02-21T18:21:24","date_gmt":"2019-02-21T18:21:24","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=2014"},"modified":"2026-05-06T08:35:32","modified_gmt":"2026-05-06T08:35:32","slug":"building-engineering","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=2014","title":{"rendered":"Building Design"},"content":{"rendered":"<table border=\"1\" width=\"1200\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"120\">\n<h6><strong>SL No.<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"450\">\n<h6><strong>Project Name<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"200\">\n<h6><strong>Location<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"100\">\n<h6><strong>Duration<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"200\">\n<h6><strong>Name of Client<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"120\">\n<h6><strong>Read More<\/strong><\/h6>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a001<\/td>\n<td style=\"text-align: left;\">Construction of 15 Storied High Rise Commercial Building(PBL Tower) at Gulshan-2, Dhaka.<\/td>\n<td style=\"text-align: left;\" >Gulshan-2, Dhaka<\/td>\n<td >1998<\/td>\n<td >PBL<\/td>\n<td ><a href=\" https:\/\/jpzbd.com\/?page_id=3333\"><img decoding=\"async\" class=\"alignleft\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-310.png\" alt=\"Untitled-3\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a002<\/td>\n<td style=\"text-align: left;\">Construction of 15 Storied SABINCO Tower<\/td>\n<td style=\"text-align: left;\">Nikunjo, Khilkhet, Dhaka<\/td>\n<td>1999<\/td>\n<td>SABINCO<\/td>\n<td><a href=\" https:\/\/jpzbd.com\/?page_id=3333\"><img decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-52.png\" alt=\"Untitled-5\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a003<\/td>\n<td style=\"text-align: left;\">STL Testing Centre at Zirabo, Savar, Dhaka<\/td>\n<td>Zirabo, Savar, Dhaka<\/td>\n<td>1999<\/td>\n<td>STL<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=4305\"><img decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-62.png\" alt=\"Untitled-6\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a004<\/td>\n<td style=\"text-align: left;\">22 Storied Commercial Complex UDAY TOWER with 4-level Basement at 57 &amp; 57\/A South Gulshan Commercial Area, Gulshan Avenue, Circle-1, Gulshan, Dhaka \u2013 1212.<\/td>\n<td style=\"text-align: left;\">Gulshan, Dhaka \u2013 1212.<\/td>\n<td>2000<\/td>\n<td>Metro Services Ltd<\/td>\n<td><a href=\" https:\/\/jpzbd.com\/?page_id=3323 \"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-72.png\" alt=\"Untitled-7\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a005<\/td>\n<td style=\"text-align: left;\">Development of 10 storied Independent University Campus at Bashundhara, Dhaka.<\/td>\n<td style=\"text-align: left;\">Bashundhara, Dhaka.<\/td>\n<td>2001<\/td>\n<td>Independent University<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3296 \"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-81.png\" alt=\"Untitled-8\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a006<\/td>\n<td>Construction of 15 Storied MAHIN Tower Building Complex at Gulshan-2, Dhaka<\/td>\n<td>Gulshan-2, Dhaka<\/td>\n<td>2001<\/td>\n<td>MAHIN Group<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3327\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-91.png\" alt=\"Untitled-9\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a007<\/td>\n<td style=\"text-align: left;\">SANARC Complex at Tejgaon I\/A, Dhaka<\/td>\n<td style=\"text-align: left;\">Tejgaon I\/A, Dhaka<\/td>\n<td>2001<\/td>\n<td>SANARC<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4318\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/7.gif\" alt=\"7\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-101.png\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a008<\/td>\n<td style=\"text-align: left;\">Vertical Extension of IDB Bhaban Shopping Complex, Sher-E-Bangla Nagar, Dhaka.<\/td>\n<td style=\"text-align: left;\">Sher-E-Bangla Nagar, Dhaka.<\/td>\n<td>2003<\/td>\n<td>IDB<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3362\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-112.png\" alt=\"Untitled-11\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a009<\/td>\n<td>Construction of CITI BANK Branch office at Gulshan-2, Dhaka.<\/td>\n<td style=\"text-align: left;\">Gulshan-2, Dhaka<\/td>\n<td>2002<\/td>\n<td>CITI BANK<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3367 \"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-121.png\" alt=\"Untitled-12\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a010<\/td>\n<td style=\"text-align: left;\">Construction of CITI BANK Branch office at Motijheel, Dhaka.<\/td>\n<td style=\"text-align: left;\">Motijheel, Dhaka.<\/td>\n<td>2002<\/td>\n<td>CITI BANK<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3372\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-131.png\" alt=\"Untitled-13\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a011<\/td>\n<td style=\"text-align: left;\">Repair and Extension Work of Existing Two-storied Buildingat Plot-7, Road-2A, Sector-5, Uttara<\/td>\n<td style=\"text-align: left;\">Plot-7, Road-2A, Sector-5, Uttara<\/td>\n<td>2002<\/td>\n<td>Privet Owner<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=2014\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-141.png\" alt=\"Untitled-14\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a012<\/td>\n<td style=\"text-align: left;\">10-Storied Academy Building including 2 nos. of basement named \u201cAhsanullah University of Science and Technology\u201d at Dhaka.<\/td>\n<td style=\"text-align: left;\">Ahsanullah University of Science and Technology\u201d at Dhaka.<\/td>\n<td>2003<\/td>\n<td>Dhaka Ahsania Mission<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3316 \"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-151.png\" alt=\"Untitled-15\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a013<\/td>\n<td style=\"text-align: left;\">Feasibility Study, Detailed Architectural and Engineering Design, Project Management and Construction Supervision for Construction of 20-Storied Family Planning Bhaban at Kawran Bazar, Dhaka<\/td>\n<td style=\"text-align: left;\">Kawran Bazar, Dhaka<\/td>\n<td>2004<\/td>\n<td>Department of Health &amp; family welfare under Minisstry of Health &amp; Family<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3319\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-161.png\" alt=\"Untitled-16\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a014<\/td>\n<td style=\"text-align: left;\">Construction of 20 Storied Residential Tower Building for Police personnel at Mirpur Police Complex, Mirpur, Dhaka.<\/td>\n<td>Mirpur Police Complex, Mirpur, Dhaka.<\/td>\n<td>2005<\/td>\n<td>B-Alam &amp; Brothers<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3301\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/PC-14Short.jpg\" alt=\"PC-14Short\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3301\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a015<\/td>\n<td style=\"text-align: left;\">Hypoid composite knit ltd., Saver<\/td>\n<td>Saver<\/td>\n<td>2005<\/td>\n<td>Hypoid composite knit ltd<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4335\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-181.png\" alt=\"Untitled-18\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a016<\/td>\n<td style=\"text-align: left;\">Detailed Design and Construction Supervision of 6-Storied Hasan General Hospital at Thakurgaon.<\/td>\n<td>Thakurgaon<\/td>\n<td>2006<\/td>\n<td>Hasan General Hospital<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4340\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-191.png\" alt=\"Untitled-19\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a017<\/td>\n<td style=\"text-align: left;\">BIE Bhaban of Bangladesh Economic Association (BEA) at 4\/C, Eskaton Garden Road, Dhaka,<\/td>\n<td>4\/C, Eskaton Garden Road, Dhaka<\/td>\n<td>2006<\/td>\n<td>BEA<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4345\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-201.png\" alt=\"Untitled-20\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a018<\/td>\n<td style=\"text-align: left;\">8-Storied NAVY Training Centre at Chittagong.<\/td>\n<td>NAVY Training Centre at Chittagong.<\/td>\n<td>2008<\/td>\n<td>NAVY<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=4350\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-212.png\" alt=\"Untitled-21\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a019<\/td>\n<td style=\"text-align: left;\">Basement. Square Knit Fabrics Ltd. Valuka, Mymensingh<\/td>\n<td>Valuka, Mymensingh<\/td>\n<td>2008<\/td>\n<td>Square Knit Fabrics Ltd<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4355\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-221.png\" alt=\"Untitled-22\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a020<\/td>\n<td>Basement. World Trade Center, Agra bad, Chittagong<\/td>\n<td>Agra bad, Chittagong<\/td>\n<td>2008<\/td>\n<td>World Trade Center,<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=4361\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-231.png\" alt=\"Untitled-23\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a021<\/td>\n<td style=\"text-align: justify;\">6-Storied Residential Building on Plot No. K-210, Dakshin Land Project, Dhaka<\/td>\n<td style=\"text-align: justify;\">Dakshin Land Project, Dhaka<\/td>\n<td>2009<\/td>\n<td>Privet Owner<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4366\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-241.png\" alt=\"Untitled-24\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a022<\/td>\n<td>Construction of Vertical Extension of City Bhaban 6th-10th floor &amp; annex Building 1st -2nd floor with 10 Storied Foundation.<\/td>\n<td>Kadirgonj, Rajshahi<\/td>\n<td>2011<\/td>\n<td>\u00a0RCC<\/td>\n<td style=\"text-align: center;\"><a href=\"https:\/\/jpzbd.com\/?page_id=3395\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-261.png\" alt=\"Untitled-26\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a023<\/td>\n<td style=\"text-align: left;\">Consultancy services for Construction and Supervision of Auditorium (22 shops at ground floor, one Auditorium at 1st floor and one Rest house at 2nd floor) under Raipura upazila, Dist. Narsingdi.<\/td>\n<td style=\"text-align: justify;\">Raipura upazila, Dist. Narsingdi.<\/td>\n<td>2012<\/td>\n<td>LGED<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3381\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-27.png\" alt=\"Untitled-27\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a024<\/td>\n<td style=\"text-align: left;\">Consultancy Service for Planning, Designing &amp; Supervision for construction of Dormitory &amp; Guest House at saha Mokhdum R\/A; Police Barrack at Office premises, Bangladesh Bank, Rajshahi and Guest House at Rupsha Officer\u2019s Quarters, Bangladesh Bank Khulna.<\/td>\n<td style=\"text-align: justify;\">Bangladesh Bank Khulna.<\/td>\n<td>2012<\/td>\n<td>Bangladesh Bank<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3387\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-28.png\" alt=\"Untitled-28\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a025<\/td>\n<td style=\"text-align: left;\">Detailed Architectural and Structural Design, including Top Supervision of Construction of 10-Storied Residential Apartment Building including 01 Basement Floor at Gulshan Dhaka (Phase-I)<\/td>\n<td style=\"text-align: justify;\">Gulshan Dhaka (Phase-I)<\/td>\n<td>2012<\/td>\n<td>RAJUK<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3286\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-29.png\" alt=\"Untitled-29\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a026<\/td>\n<td style=\"text-align: left;\">Detailed Architectural and Structural Design, including Top Supervision of Construction of 10-Storied Residential Apartment Building including 01 Basement Floor at Gulshan Dhaka (Phase-II)<\/td>\n<td style=\"text-align: justify;\">Gulshan Dhaka(Phase-II)<\/td>\n<td>2012<\/td>\n<td>RAJUK<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3291\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-30.png\" alt=\"Untitled-30\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a027<\/td>\n<td style=\"text-align: left;\">Consultancy services for The Architectural and Engineering Consulting Services for Construction of 4 Storied Market cum Commercial Complex at Upazilla of Sreemangal.<\/td>\n<td style=\"text-align: justify;\">Moulvibazar Zilla Porishod<\/td>\n<td>2012<\/td>\n<td>Moulvibazar Zilla Porishod<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3341\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-311.png\" alt=\"Untitled-31\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a028<\/td>\n<td style=\"text-align: left;\">The Architectural and Engineering Consulting Services for Construction of 4 Storied Market cum Commercial Complex at Upazilla of Kulaura<\/td>\n<td style=\"text-align: justify;\">Upazilla of Kulaura<\/td>\n<td>2012<\/td>\n<td>Kulaura Upazilla Porishod<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3356\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-321.png\" alt=\"Untitled-32\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a029<\/td>\n<td style=\"text-align: left;\">Detailed Feasibility study for the project of construction of Apartment Building for low and middle income of people at Sector-18 of Uttara Dhaka.\u201d<\/td>\n<td style=\"text-align: justify;\">Sector-18 of Uttara Dhaka.\u201d<\/td>\n<td>2012<\/td>\n<td>RAJUK<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3279\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/04\/10Building2.jpg\" alt=\"10Building2\" width=\"70\" height=\"70\" \/><\/a><a href=\" https:\/\/jpzbd.com\/?page_id=3279\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a030<\/td>\n<td style=\"text-align: left;\">Detailed Design of Plumbing System including external disposal network for the project of Construction of Apartment Building for low and middle income of people at Sector-18 of Uttara Dhaka.<\/td>\n<td style=\"text-align: justify;\">Sector-18 of Uttara Dhaka.\u201d<\/td>\n<td>2012<\/td>\n<td>RAJUK<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3391\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/04\/10Building2.jpg\" alt=\"10Building2\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3391\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a031<\/td>\n<td style=\"text-align: left;\">Consultancy Service for Structural Design and Supervision of Multi-storied Building of ICB Head Office, Rajarbag, Dhaka<\/td>\n<td style=\"text-align: justify;\">Rajarbag, Dhaka<\/td>\n<td>\u00a02012<\/td>\n<td>ICB<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3267\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-35.png\" alt=\"Untitled-35\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a032<\/td>\n<td style=\"text-align: left;\">Consultancy Service for Management and Supervision of Multi-storied Building of ICB Head Office, Rajarbag, Dhaka<\/td>\n<td style=\"text-align: justify;\">Rajarbag, Dhaka<\/td>\n<td>\u00a02012<\/td>\n<td>ICB<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3260\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-36.png\" alt=\"Untitled-36\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a033<\/td>\n<td style=\"text-align: left;\">Mother &amp; Child Care Hospital FPAB , Pabna.<\/td>\n<td style=\"text-align: justify;\">FPAB , Pabna.<\/td>\n<td>2013<\/td>\n<td>FPAB<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3399\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-37.png\" alt=\"Untitled-37\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a034<\/td>\n<td style=\"text-align: left;\">Consultancy Services for preparation of detailed technical, financial &amp; socio economic feasibility study of \u201c Construction of high rise Residential Apartment Building at Jhilmil Residential Area\u201d<\/td>\n<td style=\"text-align: justify;\">Keranigonj, Dhaka<\/td>\n<td>2014<\/td>\n<td>RAJUK<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=3376\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/34BP.gif\" alt=\"34BP\" width=\"70\" height=\"70\" \/><\/a><a href=\" https:\/\/jpzbd.com\/?page_id=3376 \"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a035<\/td>\n<td style=\"text-align: left;\">Consultancy Services forArchitectural Plan, Structural Design and Supervision for City Hall Construction of Annex Building and Design &amp; Supervision of incomplete Work of Main Building &amp; Annex Building for the RCC.<\/td>\n<td style=\"text-align: justify;\">Kadirgonj, Rajshahi<\/td>\n<td>2014<\/td>\n<td>RCC<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4371\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-39.png\" alt=\"Untitled-39\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a036<\/td>\n<td style=\"text-align: left;\">Consulting Services for Design and Supervision of Construction of 20 Storied Commercial (Multifunctional) cum Residential Building named as City Shapla Plaza &amp; 25 Storied Commercial cum Residential Building named as City Padda Plaza in Narayanganj City Corporation<\/td>\n<td style=\"text-align: justify;\">NCC<\/td>\n<td>2015<\/td>\n<td>NCC<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=3273\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-40.png\" alt=\"Untitled-40\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a037<\/td>\n<td style=\"text-align: left;\">Consultancy Services for Construction of Modern Slaughter House at Hazaribagh and Kaptan Bazar<\/td>\n<td style=\"text-align: justify;\">Kaptan Bazar<\/td>\n<td>\u00a0 2016<\/td>\n<td>DSCC<\/td>\n<td>\u00a0<a href=\" https:\/\/jpzbd.com\/?page_id=2970\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-18.jpg\" alt=\"Untitled-18\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a038<\/td>\n<td>Aga Khan Academy<\/td>\n<td>Bashundhara, Dhaka.<\/td>\n<td style=\"text-align: justify;\">\u00a02017<\/td>\n<td style=\"text-align: justify;\">AKA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/38BP.gif\" alt=\"38BP\" width=\"50\" height=\"51\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a039<\/td>\n<td style=\"text-align: left;\">Environment Friendly Master Plan for the &#8220;BEPZA Economic Zone&#8221;<\/td>\n<td>Mirsarai, Chittagong<\/td>\n<td style=\"text-align: justify;\">\u00a02017<\/td>\n<td style=\"text-align: justify;\">BEPZA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/39BP.gif\" alt=\"39BP\" width=\"52\" height=\"53\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a040<\/td>\n<td>Design of Bhandal Jhuri Water Supply Project,Chittagong Wasa.<\/td>\n<td>Bhandal Jhuri, Chittagong<\/td>\n<td style=\"text-align: justify;\">2018<\/td>\n<td style=\"text-align: justify;\">Wasa<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/40BP.gif\" alt=\"40BP\" width=\"58\" height=\"59\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a041<\/td>\n<td>Architectural plan, Design design &amp; drawing for construction of 19 nos of different structure under the project Integrated Urban Infrastructure Development in Rajshahi City (Package No. SW-02, Lot-D).<\/td>\n<td>Rajshahi City Corporation<\/td>\n<td style=\"text-align: justify;\">2021<\/td>\n<td style=\"text-align: justify;\">RCC<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4909\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/rcc12-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Wasa.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a042<\/td>\n<td>Prepare Architectural Plan &amp; detailed Engineering Design &amp; Drawing including other incidental works for construction of 19 nos.of different structure, under the Project Integrated Urban Infrastructure Development in Rajshahi City<\/td>\n<td>Rajshahi City Corporation<\/td>\n<td style=\"text-align: justify;\">2021<\/td>\n<td style=\"text-align: justify;\">RCC<\/td>\n<td>\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4909\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/rcc1-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Wasa.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\" width=\"50\">\n<p align=\"center\">43<\/p>\n<\/td>\n<td width=\"311\">Consultancy for Engineering Design and Supervision of Sustainable Coastal and Marine Fisheries Project.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">\u00a0.<\/td>\n<td style=\"text-align: left;\" width=\"481\">2021<\/td>\n<td style=\"text-align: left;\" width=\"481\">DOF<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-61.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=4916\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/marine-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-73.png\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\" width=\"50\">\n<p align=\"center\">44<\/p>\n<\/td>\n<td style=\"text-align: left;\" width=\"311\">Consultancy Services for the preparation of Masterplan and Detailed Architectural &amp; Engineering Design of Township Area under Matarbari 2\u00d7600 MW Ultra Supercritical Coal Fired Power Project.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Matarbari, Cox\u2019s Bazar<\/td>\n<td style=\"text-align: left;\" width=\"481\">2022<\/td>\n<td style=\"text-align: left;\" width=\"481\">CPGCBL<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-61.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=6557\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/matarbari-150x150.gif\" alt=\"\" width=\"75\" height=\"75\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-73.png\"><br \/>\n<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>SL No. Project Name Location Duration Name of Client Read More \u00a001 Construction of 15 Storied High Rise Commercial Building(PBL Tower) at Gulshan-2, Dhaka. Gulshan-2, Dhaka 1998 PBL \u00a002 Construction of 15 Storied SABINCO Tower Nikunjo, Khilkhet, Dhaka 1999 SABINCO \u00a003 STL Testing Centre at Zirabo, Savar, Dhaka Zirabo, Savar, Dhaka 1999 STL \u00a004 22 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2014","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2014"}],"version-history":[{"count":172,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2014\/revisions"}],"predecessor-version":[{"id":6760,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2014\/revisions\/6760"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}