{"id":2017,"date":"2019-02-21T18:22:06","date_gmt":"2019-02-21T18:22:06","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=2017"},"modified":"2026-05-04T10:04:01","modified_gmt":"2026-05-04T10:04:01","slug":"roads-bridges","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=2017","title":{"rendered":"Roads &#038; Bridges"},"content":{"rendered":"<table border=\"1\" width=\"1200\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"100\">\n<h6><strong>SL No.<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"450\">\n<h6><strong>Project Name<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"200\">\n<h6><strong>Location<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"100\">\n<h6><strong>Duration<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"200\">\n<h6><strong>Name of Client<\/strong><\/h6>\n<\/td>\n<td style=\"text-align: center;\" width=\"120\">\n<h6><strong>Read More<\/strong><\/h6>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\"><strong>\u00a001<\/strong><\/td>\n<td style=\"text-align: justify;\">Construction of 225m Bridge\u00a0over Bangshi Riverat Hatubhanga on Gorai Shakirpur Road under\u00a0 Mirzapur\u00a0Thana, Tangail\u00a0District.<\/td>\n<td style=\"text-align: justify;\">Mirzapur,Thana,Tangail District.<\/td>\n<td style=\"text-align: left;\">1998<\/td>\n<td style=\"text-align: left;\">LGED<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-431.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3492\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2415\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-432.png\" alt=\"Untitled-43\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a002<\/td>\n<td style=\"text-align: justify;\">Construction of 308m long -4-lane composite Bridge (RCC\/PC girder Bridge) over the surma river at Sylhet town.<\/td>\n<td style=\"text-align: justify;\">Sylhet town.<\/td>\n<td style=\"text-align: left;\">2000<\/td>\n<td style=\"text-align: left;\">RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-441.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3496\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2420\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-442.png\" alt=\"Untitled-44\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a003<\/td>\n<td>\n<p style=\"text-align: justify;\">Design Reviewing of 260m long 1st Dhaleshwari Bridge Under Road &amp; Highway Department.<\/p>\n<\/td>\n<td style=\"text-align: justify;\">\u00a0Munshiganj<\/td>\n<td style=\"text-align: left;\">2000<\/td>\n<td style=\"text-align: left;\">RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-452.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3500\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2423\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-453.png\" alt=\"Untitled-45\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a004<\/td>\n<td>Design Reviewing of Construction of 521.30m Long (12&#215;42.68m) P.C. Girder Bridge over River Shankha on 23rd K.M. Patiya-Anowara-Bashkhali-Toitong Road.<\/td>\n<td style=\"text-align: justify;\">Bashkhali-Toitong Road.<\/td>\n<td style=\"text-align: left;\">2000<\/td>\n<td style=\"text-align: left;\">RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-462.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3504\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2426\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-463.png\" alt=\"Untitled-46\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a005<\/td>\n<td style=\"text-align: justify;\">Toll Collection, Operation &amp; Maintenance (T, O &amp; M) Works of Bhairab Bridge and Associated Structures, Bangladesh.<\/td>\n<td style=\"text-align: justify;\">\u00a0Bhairab, Norshingdhi<\/td>\n<td style=\"text-align: left;\">2003<\/td>\n<td style=\"text-align: left;\">RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-472.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3508\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2429\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-473.png\" alt=\"Untitled-47\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a006<\/td>\n<td>Construction of 160.205 m Bridge at Pearpur over Pandop River on Bakerganj \u2013 Gobindapur GC road under Bakerganj Upazilla, Barisal District, Bangladesh.<\/td>\n<td>Barisal District, Bangladesh.<\/td>\n<td>2003<\/td>\n<td>LGED<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-482.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3513\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2433\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-483.png\" alt=\"Untitled-48\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a007<\/td>\n<td>\n<p style=\"text-align: justify;\">Construction of Teesta Bridge at 21st KM of Rangpur-Kurigram Road of Three Bridges Project under KFAED Assistance<\/p>\n<\/td>\n<td style=\"text-align: justify;\">Rangpur-Kurigram Road<\/td>\n<td>2006<\/td>\n<td>RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-491.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3538\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2435\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-492.png\" alt=\"Untitled-49\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a008<\/td>\n<td style=\"text-align: justify;\">Construction of 1310m long Dapdapia Bridge on Barisal-Patuakhali Road, Barisal, Bangladesh.<\/td>\n<td>\n<p style=\"text-align: justify;\">Barisal-Patuakhali Road, Barisal, Bangladesh.<\/p>\n<\/td>\n<td style=\"text-align: justify;\">2007<\/td>\n<td style=\"text-align: justify;\">RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-501.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3542\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2436\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-502.png\" alt=\"Untitled-50\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a009<\/td>\n<td style=\"text-align: justify;\">Upgradation and Beautification of the Kamruzzaman Central Park at Rajshahi City corporation, Rajshahi.\u2022 Construction of steel arch bridge having single span of 36m long.\u2022 Construction of steel curve bridge 42m long integrated fixed supported bridge<\/td>\n<td>Kamruzzaman Central Park at Rajshahi City corporation, Rajshahi.<\/p>\n<p style=\"text-align: justify;\">\n<\/td>\n<td>2009<\/td>\n<td>RCC<\/td>\n<td>\n<a href=\"https:\/\/jpzbd.com\/?page_id=3546\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2438\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-513.png\" alt=\"Untitled-51\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a010<\/td>\n<td>\n<p style=\"text-align: justify;\">Rehabilitation of Existing Meghna Bridge &amp; Meghna-Gumti Bridge<\/p>\n<\/td>\n<td style=\"text-align: justify;\">Meghna-Gumti Bridge<\/td>\n<td>2010<\/td>\n<td>RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3550\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2439\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-523.png\" alt=\"Untitled-52\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a011<\/td>\n<td style=\"text-align: justify;\">Feasibility Study &amp; Detail Design for Construction of Asulia-Birulia Link Road under Roads and Highway Department, Dhaka Road Circle, Dhaka.<\/td>\n<td>\n<p style=\"text-align: justify;\">Roads and Highway Department, Dhaka Road Circle, Dhaka.<\/p>\n<\/td>\n<td>2010<\/td>\n<td>RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3585\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2441\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-532.png\" alt=\"Untitled-53\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a012<\/td>\n<td style=\"text-align: justify;\">Construction of proposed FlyoverAmberkhan Sylhet City.<\/td>\n<td style=\"text-align: justify;\">Amberkhan Sylhet City<\/td>\n<td>2010<\/td>\n<td>RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-542.png\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2442\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-542.png\" alt=\"Untitled-54\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a013<\/td>\n<td style=\"text-align: justify;\">Feasibility Study &amp; Detail Design ofthe\u201cAmua Dhon River\u201d and theadjoining areas for the proposed180m Road Bridge over \u201cAmuaDhon River\u201d atKathalia Upazila inJhalakatiDistrict under RHD,JhalakatiRoad Division, Jhalakati.<\/td>\n<td style=\"text-align: justify;\">Jhalakati Road Division, Jhalakati.<\/td>\n<td style=\"text-align: justify;\">2011<\/td>\n<td>RHD<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3581\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2443\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-552.png\" alt=\"Untitled-55\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a014<\/td>\n<td style=\"text-align: justify;\">Construction of two Link Road inBetween Khulna- Jessore from MABari Sarak to City Bypass Road.<\/td>\n<td style=\"text-align: justify;\">Khulna- Jessore City Bypass Road.<\/td>\n<td style=\"text-align: justify;\">2011<\/td>\n<td>KDA<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3590\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2444\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-562.png\" alt=\"Untitled-56\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a015<\/td>\n<td>\n<p style=\"text-align: justify;\">Preparation of Master Planning of Graveyard Including detail design of Arch Bridge and other associated infrastructure near National Martyred Moment at Rayerbazar Under Dhaka North City Corporation.<\/p>\n<\/td>\n<td>\n<p style=\"text-align: justify;\">Rayerbazar Under Dhaka North City Corporation.<\/p>\n<\/td>\n<td style=\"text-align: justify;\">2012<\/td>\n<td>DNCC<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3569\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2445\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-572.png\" alt=\"Untitled-57\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a016<\/td>\n<td style=\"text-align: justify;\">Construction of Arch\/Bridge on WASA Khal at Goidertek including Approach Road<\/td>\n<td>Goidertek, Shekhertek, Dhaka<\/td>\n<td>2012<\/td>\n<td>DNCC<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-4263\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/B16.gif\" alt=\"B16\" width=\"55\" height=\"62\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a017<\/td>\n<td style=\"text-align: justify;\">Feasibility Study &amp; Detail Designfor Construction of R.C.C. Bridge onWASA Khal at Goider Tech, Adaborunder Dhaka North City corporation.<\/td>\n<td>\n<p style=\"text-align: justify;\">Goider Tech, Adabor under Dhaka North City corporation.<\/p>\n<\/td>\n<td>2012<\/td>\n<td>DNCC<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3576\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2446\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-582.png\" alt=\"Untitled-58\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a018<\/td>\n<td>\n<p style=\"text-align: justify;\">Feasibility and Detailed Structural Design of Bridge over the river Shitalakhya (2nd Connection) in Narayanganj City.<\/p>\n<\/td>\n<td>\n<p style=\"text-align: justify;\">Shitalakhya (2nd Connection) in Narayanganj City.<\/p>\n<\/td>\n<td>2014<\/td>\n<td>LGED<\/td>\n<td><a href=\" https:\/\/jpzbd.com\/?page_id=3532 \"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2449\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-602.png\" alt=\"Untitled-60\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a019<\/td>\n<td>\n<p style=\"text-align: justify;\">Consultancy Services for Repair of Cracks inside the Box Gider and strengthening of the Superstructure of the Banganbandhu Bridge.<\/p>\n<\/td>\n<td style=\"text-align: justify;\">Banganbandhu Bridge.<\/td>\n<td style=\"text-align: justify;\">2015<\/td>\n<td>BBA<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3600\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2450\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-613.png\" alt=\"Untitled-61\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a020<\/td>\n<td>\n<p style=\"text-align: justify;\">Consultancy Services for Preparation of Engineering Plan &amp; Detailed Structural Design &amp; Supervision for Construction of 4 lane Flyover under the Project Construction of East-West Link Road startingfrom Rajshahi- Naogaon main Road to Mohanpur at Rajshahi Nator Road in Rajshahi City<\/p>\n<\/td>\n<td>\n<p style=\"text-align: justify;\">Mohanpur at Rajshahi Nator Road in Rajshahi City<\/p>\n<\/td>\n<td style=\"text-align: justify;\">\u00a02015<\/td>\n<td>RCC<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3613\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2451\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-623.png\" alt=\"Untitled-62\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a021<\/td>\n<td>Bridge over kaptai lake connecting bagachari to naniarchor bridge,RANGAMATI<\/td>\n<td style=\"text-align: justify;\">RANGAMATI<\/td>\n<td>2016<\/td>\n<td>19 ECB<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-3022\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/road22.jpg\" alt=\"road22\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a022<\/td>\n<td>\n<p style=\"text-align: justify;\">Consultancy Services for Improvement of traffic management infrastructure (Intersection, Bus-stoppages\/ Bus-bay, Left lane, Guard rail, Traffic Sign, Grill, Fencing etc.)<\/p>\n<\/td>\n<td><\/td>\n<td>2016<\/td>\n<td>DSCC<\/td>\n<td><a href=\" https:\/\/jpzbd.com\/?page_id=3526\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2454\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-652.png\" alt=\"Untitled-65\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">\u00a023<\/td>\n<td>\n<p style=\"text-align: left;\">Hydrological and Morphological<\/p>\n<p style=\"text-align: left;\">Study of 15 Bridges over Different,<\/p>\n<p style=\"text-align: left;\">River,at,Dhaka,Gopalganj,Rajbari,<\/p>\n<p style=\"text-align: left;\">Kushtia,Shariatpur,Khulna,Bagerhat,<\/p>\n<p style=\"text-align: left;\">Barishal,Patuakhali,and Jhalokhati<\/p>\n<p style=\"text-align: left;\">Districts under LGED.<\/p>\n<\/td>\n<td>\n<p style=\"text-align: left;\">Dhaka,Gopalganj,Rajbari,<\/p>\n<p style=\"text-align: left;\">Kushtia,Shariatpur,Khulna, Bagerhat,Barishal,Patuakhali,<\/p>\n<p style=\"text-align: left;\">and, Jhalokhati Districts under LGED.<\/p>\n<p style=\"text-align: justify;\">\n<\/td>\n<td>2017<\/td>\n<td>LGED<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4269\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/B23.gif\" alt=\"B23\" width=\"75\" height=\"75\" \/><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\">\u00a024<\/td>\n<td style=\"text-align: justify;\">Consultancy Services for &#8221; Construction of Foot over Bridge &#8221; DSCC<\/td>\n<td style=\"text-align: justify;\">Under Dhaka South City Corporation<\/td>\n<td>2017<\/td>\n<td>DSCC<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=3559\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2459\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-672.png\" alt=\"Untitled-67\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a025<\/td>\n<td style=\"text-align: justify;\">Carrying out Classified Traffic Count Survey of RHD Road Network of Khulna,Barishal and Gopalganj Zone under the Package No-HDM\/2018-19\/SR-4<\/td>\n<td style=\"text-align: justify;\">Khulna,Barishal,and Gopalganj Zone<\/td>\n<td style=\"text-align: justify;\">2019<\/td>\n<td>RHD<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4273\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/B25.gif\" alt=\"B25\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a026<\/td>\n<td>\n<p style=\"text-align: justify;\">Consultancy Services for 90-100M RCC Bridge (BUP)<\/p>\n<\/td>\n<td style=\"text-align: justify;\">BUP, Mirpur Cantonment, Dhaka<\/td>\n<td>2019<\/td>\n<td>BUP<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4276\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/B26.gif\" alt=\"B26\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a027<\/td>\n<td>\n<p style=\"text-align: left;\">Services for Design Review and Construction Supervision\u00a0\u00a0Consultancy\u00a0 Services for Construction of Bridge at 17th km on the Kachua-<br \/>\nBetagi-Patuakhali-Lohalia-Kalayia Road over the River Paira<\/p>\n<\/td>\n<td style=\"text-align: justify;\">Patuakhali<\/td>\n<td>2021<\/td>\n<td>BBA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4944 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/paira22-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a028<\/td>\n<td>Consultancy Services For Feasibility Study, Detail Design, Estimation And Formulation Of DPP For Hazrat Shahjalal International Airport Pedestrian Underpass Project.<\/td>\n<td style=\"text-align: justify;\">Dhaka<\/td>\n<td>2023<\/td>\n<td>BA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4786 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/08\/underpass-150x146.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a029<\/td>\n<td>Consultancy Services for\u00a0 construction of Railway line from a. Chapainawabgonj to Sonamasjid b, Panchagarh to Banglabandha c. Domar to Votemari via Jaldhaka and Feasibility Study, Detail Design and preparation\u00a0of bid documents for Construction of new Railway bridge on Tista River beside the existing railway bridge, Railway west zone.<\/td>\n<td style=\"text-align: justify;\">a. Chapainawabgonj to Sonamasjid b, Panchagarh to Banglabandha c. Domar to Votemari via Jaldhaka,\u00a0Railway west zone.<\/td>\n<td>2020<\/td>\n<td>BA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4708 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2021\/06\/Rail-01-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a030<\/td>\n<td>Construction Supervision service for Construction of Lebukhali-Rampur-Mirzagonj Link Road Project Bakergonj Barishal<\/td>\n<td style=\"text-align: justify;\">Lebukhali-Rampur-Mirzagonj Link Road Project Bakergonj Barishal<\/td>\n<td>2020<\/td>\n<td>BA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4894 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/11\/lebukhali-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a031<\/td>\n<td>Consultancy Services for Design Review and construction supervision for construction of Bridge at 17 th KM on the Kachua-Betagi-Patuakhali-Lohalia-Kalayia Road over the River Paira<\/td>\n<td style=\"text-align: justify;\">Patuakhali<\/td>\n<td>2021<\/td>\n<td>BBA<\/td>\n<td><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4928 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/paira-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/td>\n<\/tr>\n<tr>\n<td>\u00a032<\/td>\n<td style=\"text-align: justify;\">Consultancy Services for\u00a0 construction of Railway line from a. Chapainawabgonj to Sonamasjid b, Panchagarh to Banglabandha c. Domar to Votemari via Jaldhaka and\u00a0Feasibility Study, Detail Design and preparation\u00a0of bid documents for Construction of new Railway bridge on Tista River beside the existing railway bridge, Railway west zone.<\/td>\n<td style=\"text-align: left;\">a. Chapainawabgonj to Sonamasjid b, Panchagarh to Banglabandha c. Domar to Votemari via Jaldhaka,\u00a0Railway west zone.<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">2020<\/p>\n<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">BR<\/p>\n<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=2956\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4249\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2021\/06\/Rail-01-e1624517142566.jpg\" alt=\"Rail4\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a033<\/td>\n<td style=\"text-align: justify;\">Construction of proposed Flyover Amber khan Sylhet City..<\/td>\n<td style=\"text-align: justify;\">Amberkhan Sylhet City.<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">2010<\/p>\n<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">RHD<\/p>\n<\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>\u00a034<\/td>\n<td style=\"text-align: justify;\">Construction of Arch\/Bridge on WASA Khal at Goidertek including Approach Road<\/td>\n<td style=\"text-align: justify;\">Goidertek,Shekhertek, Dhaka.<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">2012<\/p>\n<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">DNCC<\/p>\n<\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td>\u00a035<\/td>\n<td style=\"text-align: justify;\">Bridge over kaptai lake connecting bagachari to naniarchor bridge,RANGAMATI<\/td>\n<td style=\"text-align: justify;\">RANGAMATI.<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">2016<\/p>\n<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">19 ECB<\/p>\n<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=4965\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4968 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/19ecb-1-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td>\u00a036<\/td>\n<td style=\"text-align: justify;\">Consultancy Services for 90-100M RCC Bridge (BUP)<\/td>\n<td style=\"text-align: justify;\">BUP, Mirpur Cantonment, Dhaka.<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">2019<\/p>\n<\/td>\n<td style=\"text-align: left;\">\n<p align=\"center\">BUP<\/p>\n<\/td>\n<td><a href=\"https:\/\/jpzbd.com\/?page_id=4960\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4961 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/bup22-150x150.jpg\" alt=\"\" width=\"70\" height=\"70\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">\u00a037<\/td>\n<td style=\"text-align: left;\" valign=\"top\">Project Assistance for the development of Bhulta- Arihazar- Nabinagar- Shibpur- Radhika) (R \u2013 203) (Korikandi to Bancharampur \u2013 Nabinagar) Regional Highway and Sarail \u2013 Nasirnagar \u2013 Lakhai (R-220) (Sarail to Bolovodro Bridge) Regional Highway under Road Division Brahmanbaria during the year 2023-2024<\/td>\n<td style=\"text-align: left;\" valign=\"top\">Mongla Port Authority<\/td>\n<td style=\"text-align: left;\" valign=\"top\">2025<\/td>\n<td style=\"text-align: left;\" valign=\"top\">Roads &amp; Highways Department<\/td>\n<td valign=\"top\"><a href=\"https:\/\/jpzbd.com\/?page_id=6596\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-6598\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/roads2.gif\" alt=\"\" width=\"94\" height=\"47\" \/><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>SL No. Project Name Location Duration Name of Client Read More \u00a001 Construction of 225m Bridge\u00a0over Bangshi Riverat Hatubhanga on Gorai Shakirpur Road under\u00a0 Mirzapur\u00a0Thana, Tangail\u00a0District. Mirzapur,Thana,Tangail District. 1998 LGED \u00a0 \u00a002 Construction of 308m long -4-lane composite Bridge (RCC\/PC girder Bridge) over the surma river at Sylhet town. Sylhet town. 2000 RHD \u00a0 \u00a003 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2017","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2017"}],"version-history":[{"count":186,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2017\/revisions"}],"predecessor-version":[{"id":6696,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2017\/revisions\/6696"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}