{"id":2035,"date":"2019-02-21T18:25:37","date_gmt":"2019-02-21T18:25:37","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=2035"},"modified":"2026-05-05T18:52:19","modified_gmt":"2026-05-05T18:52:19","slug":"land-development-master-plan","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=2035","title":{"rendered":"Land Development &#038; Master Plan"},"content":{"rendered":"<table class=\"aligncenter\" border=\"1\" width=\"1200\">\n<tbody>\n<tr>\n<td width=\"100\">\n<div align=\"left\">\n<h6 align=\"center\"><strong>Sl.No<\/strong><\/h6>\n<\/div>\n<\/td>\n<th width=\"450\">\n<h6 align=\"center\"><strong>Project Name<\/strong><\/h6>\n<\/th>\n<th width=\"200\">\n<h6 align=\"center\"><strong>Location<\/strong><\/h6>\n<\/th>\n<th width=\"100\">\n<h6 align=\"center\"><strong>Duration<\/strong><\/h6>\n<\/th>\n<th width=\"200\">\n<h6 align=\"center\"><strong>Name of Client<\/strong><\/h6>\n<\/th>\n<th width=\"120\">\n<div align=\"left\">\n<h6 align=\"center\"><strong>Read More<\/strong><\/h6>\n<\/div>\n<\/th>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p>01<\/p>\n<\/div>\n<\/td>\n<td width=\"311\">\n<div align=\"left\">\n<p style=\"text-align: justify;\">Feasibility Study for Setting up Export Processing Zone in Sirajgonj &amp; Saidpur, Rajshahi Division, Bangladesh<\/p>\n<\/div>\n<\/td>\n<td width=\"321\">\n<div align=\"left\">\n<p style=\"text-align: justify;\">Sirajgonj &amp; Saidpur, Rajshahi Division, Bangladesh<\/p>\n<\/div>\n<\/td>\n<td width=\"481\">\n<div align=\"left\">\n<p>1998<\/p>\n<\/div>\n<\/td>\n<td width=\"481\">\u00a0BEPZA<\/td>\n<td width=\"481\">\n<div align=\"left\">\n<p><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-16.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3428\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2484\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-162.png\" alt=\"Untitled-16\" width=\"75\" height=\"75\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-162.png 200w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-162-150x150.png 150w\" sizes=\"(max-width: 75px) 100vw, 75px\" \/><\/a><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">02<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Upgradation and Beautification of the Kamruzzaman Central Park at Rajshahi City corporation, Rajshahi.\u2022 Preparation of Master Plan\u2022 Detailed Design of Park and Zoo related infrastructure.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Kamruzzaman Central Park at Rajshahi City corporation, Rajshahi.<\/td>\n<td width=\"481\">2009<\/td>\n<td width=\"481\">\u00a0RCC<\/td>\n<td width=\"481\">\n<div align=\"left\">\n<p align=\"left\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-171.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3420\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-4231\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/LDMP2.gif\" alt=\"LD&amp;MP2\" width=\"75\" height=\"75\" \/><\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3420\"><br \/>\n<\/a><\/p>\n<p align=\"left\">\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">03<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Preparation of Master Plan of 100 MW Gopalgonj Power Plant<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Gopalgonj Power Plant<\/td>\n<td width=\"481\">2010<\/td>\n<td width=\"481\">\u00a0ENERGYPAC<\/td>\n<td width=\"481\">\n<div align=\"left\">\n<p align=\"left\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-20.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3416\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2486\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-202.png\" alt=\"Untitled-20\" width=\"75\" height=\"75\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-202.png 200w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-202-150x150.png 150w\" sizes=\"(max-width: 75px) 100vw, 75px\" \/><\/a><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">04<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Development of Gulshan-Banani-Baridhara Lake, Dhaka.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Gulshan-Banani-Baridhara Dhaka<\/td>\n<td width=\"481\">2011<\/td>\n<td width=\"481\">RAJUK<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-211.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3433\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2487\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-213.png\" alt=\"Untitled-21\" width=\"75\" height=\"75\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-213.png 200w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-213-150x150.png 150w\" sizes=\"(max-width: 75px) 100vw, 75px\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">05<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Preparation of Master Planning of Graveyard Including detail design of Arch Bridge and other associated infrastructure near National Martyred Monument at Rayerbazar Under Dhaka North City Corporation.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Goider Tech, Adabar &#8211; Mohammudpur Link Road.<\/td>\n<td width=\"481\">2013<\/td>\n<td width=\"481\">DNCC<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-24.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=2951\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4236\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/LDMP5.gif\" alt=\"LD&amp;MP5\" width=\"75\" height=\"75\" \/><\/a><a href=\" https:\/\/jpzbd.com\/?page_id=2951\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">06<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Consultancy Services for Detail Area Planning for the Existing Area at a depth of approximately 300 meter from the project Boundary line of Integrated Development of Hatirjheel area including Begunbari khal Project.<\/td>\n<td style=\"text-align: justify;\" width=\"321\">Begunbari khal Dhaka<\/td>\n<td width=\"481\">2013<\/td>\n<td width=\"481\">RAJUK<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-22.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3437\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2488\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-222.png\" alt=\"Untitled-22\" width=\"75\" height=\"75\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-222.png 200w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-222-150x150.png 150w\" sizes=\"(max-width: 75px) 100vw, 75px\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">07<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">Consultancy Services for Development of Park and Playground<\/td>\n<td style=\"text-align: justify;\" width=\"321\"><\/td>\n<td width=\"481\">2016;<\/td>\n<td width=\"481\">DSCC<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-23.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3424\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2489\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-232.png\" alt=\"Untitled-23\" width=\"75\" height=\"75\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-232.png 200w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-232-150x150.png 150w\" sizes=\"(max-width: 75px) 100vw, 75px\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td width=\"50\">\n<div align=\"center\">\n<p align=\"center\">08<\/p>\n<\/div>\n<\/td>\n<td width=\"311\">Preparation &amp; Submission of High Quality Environment friendly Master Plan for the \u201cBEPZA Economic Zone\u201d project considering various upcoming issues like cost effective use of wealth, energy, water and other utilities at Shadhur Char and Pirer Char Mouza under Mirsarai, Chittagong.<\/td>\n<td width=\"321\">Chittagong<\/td>\n<td width=\"481\">Continue<\/td>\n<td width=\"481\">Bangladesh Export Processing Zone Authority (BEPZA).<\/td>\n<td width=\"481\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/Untitled-24.png\">\u00a0<\/a><a href=\"https:\/\/jpzbd.com\/?page_id=3443\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-3442\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/PDSL8.jpg\" alt=\"PDSL8\" width=\"75\" height=\"75\" \/><\/a><a href=\" https:\/\/jpzbd.com\/?page_id=2951\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\" width=\"50\">\n<div align=\"center\">\n<p align=\"center\">09<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"311\">\n<div align=\"left\">\n<p>Consultancy service for the preparation of masterplan and detailed architectural &amp; Engineering design of township area under matarbari 2&#215;600 MW ultra-supercritical coal fired power project<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"321\">\n<div align=\"left\">\n<p align=\"left\">\u00a0Matarbari<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: justify;\" width=\"481\">\n<div align=\"left\">\n<p align=\"left\">2022<\/p>\n<\/div>\n<\/td>\n<td width=\"481\">\n<div align=\"left\">\n<p style=\"text-align: left;\" align=\"left\">BIWTA<\/p>\n<\/div>\n<\/td>\n<td style=\"text-align: left;\" width=\"481\">\u00a0<a href=\"https:\/\/jpzbd.com\/?page_id=4923\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4921 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/matarbari-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/oo\"><br \/>\n<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"text-align: center; tab-stops: 173.15pt;\" align=\"center\">\n","protected":false},"excerpt":{"rendered":"<p>Sl.No Project Name Location Duration Name of Client Read More 01 Feasibility Study for Setting up Export Processing Zone in Sirajgonj &amp; Saidpur, Rajshahi Division, Bangladesh Sirajgonj &amp; Saidpur, Rajshahi Division, Bangladesh 1998 \u00a0BEPZA \u00a0 02 Upgradation and Beautification of the Kamruzzaman Central Park at Rajshahi City corporation, Rajshahi.\u2022 Preparation of Master Plan\u2022 Detailed Design [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2035","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2035"}],"version-history":[{"count":39,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2035\/revisions"}],"predecessor-version":[{"id":6726,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2035\/revisions\/6726"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}