{"id":2951,"date":"2019-03-25T08:54:01","date_gmt":"2019-03-25T08:54:01","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=2951"},"modified":"2019-05-11T07:53:21","modified_gmt":"2019-05-11T07:53:21","slug":"bepza-economic-zone-mirsorai-chittagong","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=2951","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/LDMP5.gif\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-4236\" alt=\"LD&amp;MP5\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/02\/LDMP5.gif\" width=\"110\" height=\"165\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-15.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 align=\"center\"><strong>Figure: <strong>Preparation of Master Planning of Graveyard Including detail design<\/strong><\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\"><strong><span style=\"text-decoration: underline;\">Project Name:<strong>Preparation of Master Planning of Graveyard Including detail design of Arch Bridge and other associated infrastructure near National Martyred Monument at Rayerbazar Under Dhaka North City Corporation.<\/strong><\/span><\/strong><\/p>\n<p><strong><span style=\"text-decoration: underline;\">Client:<\/span> DNCC<\/strong><\/p>\n<p><strong><span style=\"text-decoration: underline;\">Location <\/span>: <strong>Goider Tech, Adabar \u2013 Mohammudpur Link Road.<\/strong><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong><span style=\"text-decoration: underline;\">Project Duration:<\/span> 2013<\/strong><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Figure: Preparation of Master Planning of Graveyard Including detail design Project Name:Preparation of Master Planning of Graveyard Including detail design of Arch Bridge and other associated infrastructure near National Martyred Monument at Rayerbazar Under Dhaka North City Corporation. Client: DNCC Location : Goider Tech, Adabar \u2013 Mohammudpur Link Road. &nbsp; Project Duration: 2013 &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2951","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2951"}],"version-history":[{"count":6,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2951\/revisions"}],"predecessor-version":[{"id":4241,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/2951\/revisions\/4241"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}