{"id":3395,"date":"2019-03-31T09:12:52","date_gmt":"2019-03-31T09:12:52","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=3395"},"modified":"2019-03-31T09:12:52","modified_gmt":"2019-03-31T09:12:52","slug":"3395","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=3395","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSB-23.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-3396\" alt=\"PDSB-23\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSB-23.jpg\" width=\"299\" height=\"252\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-171.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 align=\"center\"><\/h3>\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\">6th-10th floor &amp; annex Building<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p align=\"center\">Construction of Vertical Extension of City Bhaban 6th-10th floor &amp; annex Building 1st -2nd floor with 10 Storied Foundation.<\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p align=\"center\">Rajshahi City Corporation, Rajshahi., Bangladesh.<\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p align=\"center\">Nagar Bhaban, Kadirgong, Rajshahi.<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p align=\"center\">Mar, 2013<\/p>\n<p align=\"center\"><b>Project of Description:<\/b><\/p>\n<p align=\"center\">Main objective of the consultancy services under the Terms of Reference, City Bhaban Complex earlier constructed 5 storied Office Bhaban with 10 storied foundations. Now it needs vertical extension and also 2 storied New Annex building with 10 storied foundations to accommodated officers &amp; staffs of RCC.Vertical extension of existing City Bhaban 6<sup>lh<\/sup> to 10<sup>lh<\/sup> floor with total floor space of about 6738.75 sq.meter and proposed Annex City Bhaban 1<sup>s1<\/sup> to 2<sup>nd<\/sup> floor with 10 storied foundations with total floor 818.00 sq.m. along with other facilities, shall have to be provided.<\/p>\n<p align=\"center\"><b>Services Provided:<\/b><\/p>\n<p>Office Room, Central Store Room, Record Room &amp; Central Mosque.Office Space.Guest Room, including Kitchen, Dining, Drawing.Air-Conditioning.CCTV.Toilets for General use.Car Parking.Internal Road.Garbage Disposal.Gas Connection.Fire Hydrants, Fire water supply, Fire Alarm system.Water Supply connection with Telephone &amp; Intercom Connection.The Building would be attractive, sophisticated and economic as well as smoothly functional in all respects. The building will be RCC. column structure, internal &amp; external wall of which will be in as cast concrete or Brick wall.Electric Sub-station.<\/p>\n<p align=\"center\"><b>\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 6th-10th floor &amp; annex Building Assignment Name: Construction of Vertical Extension of City Bhaban 6th-10th floor &amp; annex Building 1st -2nd floor with 10 Storied Foundation. Name of Client: Rajshahi City Corporation, Rajshahi., Bangladesh. Location: Nagar Bhaban, Kadirgong, Rajshahi. Year of Completion: Mar, 2013 Project of Description: Main objective of the consultancy services under [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3395","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3395"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3395\/revisions"}],"predecessor-version":[{"id":3397,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3395\/revisions\/3397"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}