{"id":3416,"date":"2019-03-31T09:55:36","date_gmt":"2019-03-31T09:55:36","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=3416"},"modified":"2026-08-23T17:31:14","modified_gmt":"2026-08-23T17:31:14","slug":"3416-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=3416","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL3.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-3417\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL3.jpg\" alt=\"PDSL3\" width=\"500\" height=\"400\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL3.jpg 500w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL3-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-171.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<h3 align=\"center\"><\/h3>\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\">Gopalgonj Power Plant<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p align=\"center\">Preparation of Master Plan of 100 MW Gopalgonj Power Plant<b>\u00a0<\/b><\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p align=\"center\">Energypac Power Generation Ltd.<\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p align=\"center\">Gopalgonj, Bangladesh<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p align=\"center\">August 2010<b><\/b><\/p>\n<p><strong><b>Description of the Project:<\/b><\/strong><\/p>\n<p>Complete engineering, design, manufacturing, inspection, testing, supply, delivery to the site, site preparation, shifting of existing establishments or infrastructure (if required), related civil and building works, installation, erection, testing &amp; commissioning of HFO fired Engine Generating Sets Power Plant Project [capacity of each identical unit is not less than 5 MW and dual-fuel gas turbine Power Plant Project [2to 4 identical units], having net output as mentioned in each tender document at Site conditions of 35\u00b0C, 1.013 bar, 98% R.H., including necessary auxiliaries and ancillaries on Turnkey basis as stated in the scope of work of the Tender document. The Tenderer shall also provide a 2 (two) year warranty period for the entire work as well as Long-Term Service under a Long-Term Service Agreement (LTSA) for the next 4 years.<\/p>\n<p><strong><b>Services Provided:<\/b><\/strong><\/p>\n<p align=\"center\">Economic evaluation: Economic Analysis\/socio-economic condition of the zone of influence and Environmental Impact Assessment. Effect on poverty alleviation due to the implementation of the project. Data collection relating to investment opportunity, market projection, etc. Hydrological and Morphological Study, drainage facilities, subsoil investigation. Climatology, geology, seismic, and geo-technical consideration. Development of approach road; study of services\/utilities relocation\/ installation. Preliminary design and drawings of the infrastructure.<\/p>\n<p align=\"center\"><b>\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Gopalgonj Power Plant Assignment Name: Preparation of Master Plan of 100 MW Gopalgonj Power Plant\u00a0 Name of Client: Energypac Power Generation Ltd. Location: Gopalgonj, Bangladesh Year of Completion: August 2010 Description of the Project: Complete engineering, design, manufacturing, inspection, testing, supply, delivery to the site, site preparation, shifting of existing establishments or infrastructure (if [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3416","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3416"}],"version-history":[{"count":2,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3416\/revisions"}],"predecessor-version":[{"id":6997,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3416\/revisions\/6997"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}