{"id":3424,"date":"2019-03-31T10:07:51","date_gmt":"2019-03-31T10:07:51","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=3424"},"modified":"2019-03-31T10:07:51","modified_gmt":"2019-03-31T10:07:51","slug":"3424","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=3424","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL6.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-3425\" alt=\"PDSL6\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL6.jpg\" width=\"600\" height=\"200\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL6.jpg 600w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/PDSL6-300x100.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-171.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 align=\"center\"><\/h3>\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\">19 Nos. Park and 12 Nos. Playground<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p align=\"center\"><b>\u201cDevelopment of 19 Nos. Park and 12 Nos. Playground \u201cUnder Development of Different Infrastructures o of Dhaka South City Corporation.<\/b><b><\/b><\/p>\n<p align=\"center\"><b>\u00a0<\/b><\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p align=\"center\">Dhaka South City Corporation (DSCC)<\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p align=\"center\">Dhaka South City Corporation.<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p align=\"center\"><b>June<\/b>, 2018<b><\/b><\/p>\n<p align=\"center\"><b>Project of Description:<\/b><\/p>\n<p style=\"text-align: justify;\" align=\"center\">The objective of the services is to prepare a plan after appraising field situation, prepare\u00a0 and present\u00a0 models showing different present and future options; prepare architectural, structural and other necessary 30\u00a0 drawing, design; production of working drawings, preparation of estimate, Bill of Quantity (BOQ),\u00a0 specifications and assist in preparing\u00a0 and evaluating\u00a0\u00a0 tender\u00a0 documents,\u00a0 providing\u00a0 full time\u00a0 supervision\u00a0 and quality control, bill certification etc. in due time for Development of Park and Playground.<b><\/b><\/p>\n<p align=\"center\"><b>Services Provided:<\/b><\/p>\n<p style=\"text-align: justify;\" align=\"center\">The Consultant will under take there view in go fprevious study reports,carry out survey in gand in vestigate the\u00a0 project sites physically,performing the analysis and design task assignment.The scope of services of this project can be clearly stated as follows: Carry out feasibility study to find out alternative options which may yield higher benefit and also fulfilling\u00a0\u00a0 DSCC\u2019s need. Assess functional and architectural\u00a0\u00a0 needs\u00a0 of\u00a0 DSCC,\u00a0 Focus\u00a0\u00a0\u00a0 Group\u00a0\u00a0 Discussion (FGD)\u00a0\u00a0\u00a0 with DSCC management personnel regarding different utilities and works; Carry out digital topographic survey for capturing Site-Plan and surrounding features; where the consultant may propose alternative options resulting optimum benefit for DSCC. Prepare Visionary Plan for present and future infrastructure requirement Park and Playground landscape design. Recreational, Mass gathering, Kids Playing facility development proposal and related infrastructure design. Walkway, street lighting, Walkway lighting, Grass bed design etc. and Renovation \/ new design of pavilion &amp; Benches. Parking suggestion.<\/p>\n<p align=\"center\"><b>\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 19 Nos. Park and 12 Nos. Playground Assignment Name: \u201cDevelopment of 19 Nos. Park and 12 Nos. Playground \u201cUnder Development of Different Infrastructures o of Dhaka South City Corporation. \u00a0 Name of Client: Dhaka South City Corporation (DSCC) Location: Dhaka South City Corporation. Year of Completion: June, 2018 Project of Description: The objective of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3424","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3424"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3424\/revisions"}],"predecessor-version":[{"id":3426,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3424\/revisions\/3426"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}