{"id":3513,"date":"2019-03-31T13:18:56","date_gmt":"2019-03-31T13:18:56","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=3513"},"modified":"2019-03-31T13:19:31","modified_gmt":"2019-03-31T13:19:31","slug":"3513-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=3513","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/RB-6.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-3514\" alt=\"R&amp;B-6\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/RB-6.jpg\" width=\"319\" height=\"263\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/RB-6.jpg 319w, https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/RB-6-300x247.jpg 300w\" sizes=\"(max-width: 319px) 100vw, 319px\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-171.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 align=\"center\"><\/h3>\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\">Pandop Bridge, Barisal, Bangladesh<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\" valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p>Construction of 160.205 m Bridge at Pearpur over Pandop River on Bakerganj \u2013 Gobindapur GC road under Bakerganj Upazilla, Barisal District, Bangladesh.<\/p>\n<p align=\"center\"><b>\u00a0<\/b><\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p align=\"center\">sLocal Government Engineering Department (LGED),<b><\/b><\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p align=\"center\">Bakerganj Upazilla, Barisal District, Bangladesh.<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p align=\"center\">August 2006<\/p>\n<p align=\"center\"><b>Project of Description:<\/b><\/p>\n<p><b>Date <\/b>Bangladesh The main objective of the project was to provide better land transport communication facilities to the project areas with a view to developing Bakerganj. To provide these facilities, the Govt. of Bangladesh Through Local Government Engineering Department (LGED) Planned to carry out turnkey contract for construction of the <b>Pearpur Bridge over Pandop river<\/b> at Bakerganj, Barisal, Bangladesh.<\/p>\n<p style=\"text-align: center;\"><b><\/b><b>Services Provided:<\/b><\/p>\n<p>Feasibility Study &amp; Preliminary Design., Detailed hydrological investigation ,Soil &amp; sub-surface investigation. Materials investigation, Traffic survey, Fixation of bridge and approach road alignment, curvature, Super-elevation. Acquisition Land Plan and determine the land planned to be required for bridge structure, approaches and construction facilities .Detailed design, construction supervision and continuous monitoring of the project .Working plan of Shifting\/relocation\/installment of utilities in the project area. Preparation of Project implementation plan, construction schedules. Preparations of bill of quantities, cost estimate and Tender Documents. Final economic evaluation of the project. Preparation of LAP, RAP &amp; EMP.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Pandop Bridge, Barisal, Bangladesh Assignment Name: Construction of 160.205 m Bridge at Pearpur over Pandop River on Bakerganj \u2013 Gobindapur GC road under Bakerganj Upazilla, Barisal District, Bangladesh. \u00a0 Name of Client: sLocal Government Engineering Department (LGED), Location: Bakerganj Upazilla, Barisal District, Bangladesh. Year of Completion: August 2006 Project of Description: Date Bangladesh The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-3513","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3513","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3513"}],"version-history":[{"count":2,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3513\/revisions"}],"predecessor-version":[{"id":3516,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/3513\/revisions\/3516"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}