{"id":4350,"date":"2019-05-28T08:57:40","date_gmt":"2019-05-28T08:57:40","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=4350"},"modified":"2019-05-28T08:57:40","modified_gmt":"2019-05-28T08:57:40","slug":"4350","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=4350","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/05\/18Big.gif\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-4351\" alt=\"18Big\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/05\/18Big.gif\" width=\"387\" height=\"204\" \/><\/a><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/05\/17Big.gif\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 align=\"center\"><\/h3>\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\">NAVY Training Center at Chittagong<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p align=\"center\">8-Storied NAVY Training Centre at Chittagong.<\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p align=\"center\">NAVY<\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p align=\"center\">NAVY Training Centre at Chittagong.<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p align=\"center\">2008<\/p>\n<p align=\"center\"><b>Project of Description:<\/b><\/p>\n<p align=\"center\">Concrete frame-structure, Potenga<\/p>\n<p align=\"center\"><b>Services Provided:<\/b><\/p>\n<p align=\"center\"><b style=\"text-align: justify;\"><\/b><\/p>\n<p align=\"center\">Master planning, architectural design, structural design and MEP. Six months supervision period.<\/p>\n<p align=\"center\"><b style=\"text-align: justify;\">\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 NAVY Training Center at Chittagong Assignment Name: 8-Storied NAVY Training Centre at Chittagong. Name of Client: NAVY Location: NAVY Training Centre at Chittagong. Year of Completion: 2008 Project of Description: Concrete frame-structure, Potenga Services Provided: Master planning, architectural design, structural design and MEP. Six months supervision period. \u00a0<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-4350","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4350"}],"version-history":[{"count":2,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4350\/revisions"}],"predecessor-version":[{"id":4354,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4350\/revisions\/4354"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}