{"id":4797,"date":"2023-08-26T13:40:37","date_gmt":"2023-08-26T13:40:37","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=4797"},"modified":"2023-08-26T13:40:38","modified_gmt":"2023-08-26T13:40:38","slug":"4797-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=4797","title":{"rendered":""},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"592\" height=\"218\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/08\/bhairab_biwta_bannar.jpg\" alt=\"\" class=\"wp-image-4798\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/08\/bhairab_biwta_bannar.jpg 592w, https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/08\/bhairab_biwta_bannar-300x110.jpg 300w\" sizes=\"(max-width: 592px) 100vw, 592px\" \/><\/figure>\n\n\n\n<p>Supervision &amp;\nMonitoring of Dredgingalong the Navigational Routes<\/p>\n\n\n\n<p><strong>Assignment Name:<\/strong><\/p>\n\n\n\n<p>Consulting Services\nfor Supervision &amp; Monitoring of Performance Based Dredging Contracts with\nMaintenance Dredging and Installation &amp; amp; Maintenance of Navigational\nAids along the Navigational Routes under the Contract Bangladesh Regional\nWaterway Transport Project-I (BRWTP-1)<\/p>\n\n\n\n<p><strong>Name of Client:<\/strong><\/p>\n\n\n\n<p>Bangladesh Inland\nWater Transport Authority (BIWTA)<\/p>\n\n\n\n<p><strong>Location:<\/strong><\/p>\n\n\n\n<p>Bhairab to\nChottogram, Bangladesh<\/p>\n\n\n\n<p><strong>Year of\nCompletion:<\/strong><\/p>\n\n\n\n<p>October 2028<\/p>\n\n\n\n<p><strong>Project of Description:<\/strong><\/p>\n\n\n\n<p>The development and control of Inland Water Transport (IWT) is the\nresponsibility of the Bangladesh Inland Water Transport Authority (BIWTA),\nunder the Ministry of Shipping (MoS). Among its functions for passenger traffic,\nBIWTA is responsible to:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Develop, maintain and\n     operate inland river routes to maintain the advertised Least Available\n     Depth (LAD) and width by necessary surveys and dredging works including\n     maintaining the necessary navigation measures to operate the vessels\n     effectively;<\/li><li>Develop, maintain and\n     operate inland river ports, landing ghats and terminal facilities in such\n     ports or ghats; and,<\/li><li>Develop the most\n     economical facilities for passenger traffic to ensure comfort, safety and\n     speed on mechanized craft.<\/li><\/ul>\n\n\n\n<p>In order to improve key multi-modal transport corridors and networks that\nwould address current transport bottlenecks in Bangladesh, the World Bank is\nfinancing the Bangladesh Regional Waterway Transport Project I (BRWTP-1). It is\ncentered on the main Dhaka-Chittagong IWT route, with branches to Ashuganj,\nGhorashal and Barisal.<\/p>\n\n\n\n<p><strong>Services Provided:<\/strong><\/p>\n\n\n\n<p>The main objective of this consultancy service\nis to monitor, supervise, and administer the contracts for performance-based\ndredging works, installation and operation of aids to navigation along the\nnavigational routes under the BR WTP-W 1 A package.<\/p>\n\n\n\n<p>The above-mentioned works are to be undertaken\nunder an output and performance-based method of contracting. Output and\nPerformance-Based Contracting for Inland Water Navigation (OPBC-IWN) is a\nresults-oriented contracting method that focuses on the outputs, quality, or\noutcomes and ties at least a portion of a contractor&#8217;s payment, contract\nextensions, or contract renewals to the achievement of specific, measurable performance\nstandards and requirements. Supervision of OPBC-IWN contracts is to be done\nwith due care and diligence following the highest professional practices and\nInternational Hydrographic Organization (IHO) S-44 5th edition standards and\nsurveys.<\/p>\n\n\n\n<p>Major Components of BRWTP-1 includes the\nfollowing:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Capital and maintenance dredging, installation and operation of aids to\nnavigation and construction and maintenance of Vessel Storm Shelters (VSS) \/\nIdle Berthing Centers (IBC);<\/li><li>Development of Cargo Terminals;<\/li><li>Development of Passenger Terminals; and,<\/li><li>Development of Landing Ghats.<\/li><\/ul>\n\n\n\n<p>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Supervision &amp; Monitoring of Dredgingalong the Navigational Routes Assignment Name: Consulting Services for Supervision &amp; Monitoring of Performance Based Dredging Contracts with Maintenance Dredging and Installation &amp; amp; Maintenance of Navigational Aids along the Navigational Routes under the Contract Bangladesh Regional Waterway Transport Project-I (BRWTP-1) Name of Client: Bangladesh Inland Water Transport Authority (BIWTA) Location: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4797","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4797"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4797\/revisions"}],"predecessor-version":[{"id":4799,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4797\/revisions\/4799"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}