{"id":4896,"date":"2023-11-29T20:21:03","date_gmt":"2023-11-29T20:21:03","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=4896"},"modified":"2023-11-29T20:21:05","modified_gmt":"2023-11-29T20:21:05","slug":"4896-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=4896","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\">\u00a0<img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-4897 size-full\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/11\/lebukhali2.jpg\" alt=\"\" width=\"630\" height=\"173\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/11\/lebukhali2.jpg 630w, https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/11\/lebukhali2-300x82.jpg 300w\" sizes=\"(max-width: 630px) 100vw, 630px\" \/><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Untitled-171.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<h3 style=\"text-align: center;\" align=\"center\"><\/h3>\n<p style=\"text-align: center;\">Lebukhali-Rampur-Mirzagonj Link Road Project\u201d, Lebukhali<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p style=\"text-align: center;\">Supervision Services for Construction of Lebukhali-Rampur-Mirzagonj Link Road Project (10 Nos.\u00a0 Bridges, 5.436 KM 4 Lane Road and 5.505 KM 2 Lane Road)<\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p style=\"text-align: center;\">19 ECB, 24 Engineering Construction Brigade Bangladesh Army.<\/p>\n<p align=\"center\"><b>Location:<\/b><\/p>\n<p style=\"text-align: center;\">Patuakhali<\/p>\n<p align=\"center\"><strong>Year of Completion:<\/strong><\/p>\n<p style=\"text-align: center;\">30 December 2022<\/p>\n<p align=\"center\"><b>Project of Description:<\/b><\/p>\n<p style=\"text-align: center;\">Sheikh Hasina cantonment. Sheikh Hasina Cantonment is the headquarter of 7th Infantry Division of Bangladesh Army. It is located in Lebukhali, Patuakhali. The area of the cantonment is 1532 acres. The services include four lane 5.436 km &amp; Two lane 5.505 km. PC girder bridges in four-lane road 7 nos. &amp; PC girder bridges in two-lane road 3 nos. 5.5 km one side and 5.505km two side. (Appx) &amp; Bus bay-2 nos.<\/p>\n<p align=\"center\"><b>Services Provided:<\/b><\/p>\n<ul>\n<li>Preparing RDPP<\/li>\n<li>Project Management<\/li>\n<li>Pre-survey work<\/li>\n<li>Checking of Survey work<\/li>\n<li>Quality Control of Construction Work<\/li>\n<li>Construction Supervision4-Lane Road: 5.436km<\/li>\n<li>2-Lane Road: 5.505 km<\/li>\n<li>PC Girder Bridge \u2013 10 Nos.<\/li>\n<li>Median in 4-Lane Road<\/li>\n<li>Roundabout<\/li>\n<li>Bus Bay<\/li>\n<li>Drainage System<\/li>\n<li>Street Lightening<\/li>\n<li>Land Acquisition 6.18 Acre<\/li>\n<li style=\"text-align: center;\"><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"text-align: center;\" align=\"center\">\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Lebukhali-Rampur-Mirzagonj Link Road Project\u201d, Lebukhali Assignment Name: Supervision Services for Construction of Lebukhali-Rampur-Mirzagonj Link Road Project (10 Nos.\u00a0 Bridges, 5.436 KM 4 Lane Road and 5.505 KM 2 Lane Road) Name of Client: 19 ECB, 24 Engineering Construction Brigade Bangladesh Army. Location: Patuakhali Year of Completion: 30 December 2022 Project of Description: Sheikh Hasina [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4896","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4896"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4896\/revisions"}],"predecessor-version":[{"id":4898,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/4896\/revisions\/4898"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}