{"id":5004,"date":"2023-12-05T18:33:30","date_gmt":"2023-12-05T18:33:30","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=5004"},"modified":"2023-12-05T18:33:31","modified_gmt":"2023-12-05T18:33:31","slug":"5004-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=5004","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"285\"> <img decoding=\"async\" class=\"aligncenter wp-image-4999 size-thumbnail\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2023\/12\/rail234-1-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\"><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Railway2.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p style=\"text-align: center;\"><strong>Janalihut-CUET-Kaptai Dual Gauge Railway Link<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"285\">\n<p align=\"center\"><b>Assignment Name:<\/b><\/p>\n<p style=\"text-align: center;\">Consultancy Services for Feasibility Study and Detailed Design for Construction of Janalihut-CUET-Kaptai Dual Gauge Railway Link<\/p>\n<p align=\"center\"><b>Name of Client<\/b>:<\/p>\n<p style=\"text-align: center;\">Bangladesh Railway (BR)<\/p>\n<p align=\"center\"><b>Location :<\/b><\/p>\n<p style=\"text-align: center;\">Janalihut-CUET-Kaptai<\/p>\n<p align=\"center\">Year of Completion:<\/p>\n<p style=\"text-align: center;\">May 2019<\/p>\n<p align=\"center\"><b>Project of Description :<\/b><b><\/b><\/p>\n<p>The Government of Bangladesh has embarked upon a project for Construction of a Dual Gauge railway link from Janalihut to Kaptai via CUET (in\/c IT village) with a view to open a new railway transport mode from Chittagong (Janalihut station) to CUET (Chittagong University of Engineering and Technology) including its nearby area and beyond it up to Kaptai if found feasible.<\/p>\n<ol>\n<li>This project will reduce the travel time and will be helpful for passenger by providing a easy and smooth movement.<\/li>\n<li>Considering the present situation (time consuming, excessive fare, local community people and CUET student\u2019s concern) this project is designed.<\/li>\n<\/ol>\n<p style=\"text-align: center;\">Implementation of the proposed project, is targeting that Bangladesh Railway would be able to operate Commuter trains from 6 .00 am to 12.00 pm (mid-night) with the frequency of minimum 30 minutes which will help to reduce traffic congestion in Chittagong city.<\/p>\n<p align=\"center\"><b>Services Provided<\/b><\/p>\n<p style=\"text-align: center;\"><strong><u>Phase &#8211; I: Feasibility Study &amp; Preliminary Design<\/u><\/strong><\/p>\n<p style=\"text-align: center;\">Traffic study and forecast; Topographic and existing utility setup survey; <strong>Climatology. Geology and Geotechnical Consideration. Seismicity; Construction materials; Physical Planning; <\/strong>Design Criteria; Preliminary cost estimate; Techno-Economic Analysis:<\/p>\n<p style=\"text-align: center;\"><strong><u>Phase<\/u><\/strong><strong><u>-II: <\/u><\/strong><strong><u>Detailed Engineering Design and Preparation of Tender Documents:<\/u><\/strong><\/p>\n<p style=\"text-align: center;\">Soil and sub-surface Investigation; Materials Investigation; Fixation of route alignment; Shifting of utilities; Determination of requirement of land; Detail Design; Project Implementation Plan; Final Cost Estimate; Preparation of Tender Documents.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p align=\"center\">\n","protected":false},"excerpt":{"rendered":"<p>Janalihut-CUET-Kaptai Dual Gauge Railway Link Assignment Name: Consultancy Services for Feasibility Study and Detailed Design for Construction of Janalihut-CUET-Kaptai Dual Gauge Railway Link Name of Client: Bangladesh Railway (BR) Location : Janalihut-CUET-Kaptai Year of Completion: May 2019 Project of Description : The Government of Bangladesh has embarked upon a project for Construction of a Dual [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5004","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5004"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5004\/revisions"}],"predecessor-version":[{"id":5005,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5004\/revisions\/5005"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}