{"id":5013,"date":"2023-12-05T19:05:15","date_gmt":"2023-12-05T19:05:15","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=5013"},"modified":"2026-08-25T16:06:42","modified_gmt":"2026-08-25T16:06:42","slug":"5013-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=5013","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-7031 size-full\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/08\/dphe.jpg\" alt=\"\" width=\"206\" height=\"251\" \/><a href=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2019\/03\/Railway2.jpg\"><br \/>\n<\/a><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<p style=\"text-align: center;\"><strong><b>Socio-Economic Study, EIA &amp; Detailed Engineering Survey &amp; Investigation, and Engineering Design<\/b><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<p style=\"text-align: center;\"><strong><b>Assignment Name:<\/b><\/strong><\/p>\n<p>Socio-Economic Study, EIA &amp; Detailed Engineering Survey &amp; Investigation and Engineering Design under the Project \u201cGroundwater Management and TPP for Survey, Investigation and Feasibility Study in Upazila and Growth Centre Level 148 Pourashava having no Piped Water Supply System.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong><b>Name of the Client<\/b><\/strong>:<\/p>\n<p style=\"text-align: center;\">Department of Public Health Engineering (DPHE), Bangladesh<\/p>\n<p style=\"text-align: center;\"><strong><b>Location:<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">148 Pourashavas in Different Districts of Bangladesh<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong><b>Year of Completion:<\/b><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">January 2014<\/p>\n<p><strong><b>\u00a0<\/b><\/strong><\/p>\n<p><strong><b>Description of the Project:<\/b><\/strong><\/p>\n<p>The main objective of this project is to provide a safe drinking water supply for 148 Pourashavas of Different districts of Bangladesh having no piped water supply system. The objectives of the study project are in details are as follows: Identify safe drinking water sources from hazardous chemicals, especially arsenic contamination.<\/p>\n<p>Conduct a feasibility study to determine the ground\/surface source to make sure about the quality of water, as well as to ensure a potential perennial source. Determine water demand and level of service, and formulate design criteria to satisfy the basic needs. Preparation of master plans for each town on water supply, sanitation, and drainage issues. Carrying out economic and financial analysis to determine the affordability of the beneficiaries and formulating a cost recovery mechanism, including a tariff strategy<\/p>\n<p><strong><b>Services Provided:<\/b><\/strong><\/p>\n<p align=\"center\">Review of the existing Hydrological and Morphological Study Report. Carry out and prepare the topographical features of the project area. Detailed hydrological analysis of the project area.\u00a0Soil investigation, Topographic Survey, EIA study, etc. Preliminary design, detailed working design &amp; drawings. Preparation of detailed cost estimate, tender documents, and bill of quantities. Drainage, Culverts, Water treatment Plant (Surface &amp; IRP), Sanitation, and Solid waste components. Evaluation of tender bids and assisting the Owner in awarding the work to the selected worker. Detailed supervision of the construction work to ensure the quality of work as per the specification<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p align=\"center\">\n","protected":false},"excerpt":{"rendered":"<p>Socio-Economic Study, EIA &amp; Detailed Engineering Survey &amp; Investigation, and Engineering Design Assignment Name: Socio-Economic Study, EIA &amp; Detailed Engineering Survey &amp; Investigation and Engineering Design under the Project \u201cGroundwater Management and TPP for Survey, Investigation and Feasibility Study in Upazila and Growth Centre Level 148 Pourashava having no Piped Water Supply System. &nbsp; Name [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5013","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5013"}],"version-history":[{"count":4,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5013\/revisions"}],"predecessor-version":[{"id":7032,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/5013\/revisions\/7032"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}