{"id":6589,"date":"2026-05-01T19:39:21","date_gmt":"2026-05-01T19:39:21","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=6589"},"modified":"2026-05-01T19:39:21","modified_gmt":"2026-05-01T19:39:21","slug":"lao-pdr-southeast-asia-disaster-risk-management-project-component-1","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=6589","title":{"rendered":"LAO PDR SOUTHEAST ASIA DISASTER RISK MANAGEMENT PROJECT: COMPONENT 1"},"content":{"rendered":"<table border=\"1\" width=\"1200\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-6590\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/water5.gif\" alt=\"\" width=\"600\" height=\"299\" \/><\/td>\n<td valign=\"top\" width=\"1200\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-6591\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/05\/water6.gif\" alt=\"\" width=\"600\" height=\"299\" \/><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"1\" width=\"1200\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<h3 align=\"center\"><strong>LAO PDR SOUTHEAST ASIA DISASTER RISK MANAGEMENT PROJECT: COMPONENT 1<\/strong><\/h3>\n<h3 align=\"center\"><strong>\u00a0<\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<p style=\"text-align: center;\"><strong>Assignment Name:<\/strong><\/p>\n<p style=\"text-align: center;\">Consulting Firm Service for Construction Supervision in the Provinces of Luang Prabang and Borikhamxay (Reference no: AF\/C002)<\/p>\n<p style=\"text-align: center;\"><strong>Name of Client<\/strong>:<\/p>\n<p style=\"text-align: center;\">Department of Waterways, Ministry of Public Works and Transport<\/p>\n<p style=\"text-align: center;\"><strong>Location:<\/strong><\/p>\n<p style=\"text-align: center;\">Vientiane Capital,Lao PDR<\/p>\n<p style=\"text-align: center;\"><strong>Year of Completion:<\/strong><\/p>\n<p style=\"text-align: center;\">December2025<\/p>\n<p style=\"text-align: center;\"><strong>Project Description:<\/strong><\/p>\n<p>In 2018, the Lao PDR experienced widespread floods, which significantly impacted its people and economy. To help reduce the financing gap and augment the response efforts, the World Bank approved Additional Financing (LDRM-AF, or AF) of about $25 million. This includes funding for structural investments to strengthen flood protection to support additional investments in Muang Xay and to implement similar activities in two additional provinces, i.e., Luang Prabang (LPB) and Borikhamxay (BKX). The planned investments in LPB comprise the construction of around 2 km of riverbank protection along the lower part of Nam Khan and the installation of four water gates and associated pumps on urban tributaries\/creeks that join the Mekong River and Nam Khan, and a potential riverside park. In Pakxan City, Borikhamxay, around 1.2 km of riverbank protection along the Mekong River is planned.<\/p>\n<p style=\"text-align: center;\"><strong>Services Provided:<\/strong><\/p>\n<p>This assignment covers the construction supervision of the planned flood protection investments in LPB and BKX of a total estimated value of $12 m ($7m in LPB and $5m in BKX). Detailed designs and bidding documents for the works will be prepared by other consultants and are expected to be completed by the 3<sup>rd<\/sup> quarter of 2021.<\/p>\n<ul>\n<li>Ensure that all works are constructed to the prescribed quality in accordance with the specifications of the bidding documents,work contracts, and quality assurance systems;<\/li>\n<li>Monitor construction methods and quality control;<\/li>\n<li>Certify the quality of work conforms to the specifications and drawings;<\/li>\n<li>Provide technical assistance to DOW during the Defects Liability Period; and<\/li>\n<\/ul>\n<p style=\"text-align: center;\">Perform all other items of work not specifically mentioned below, but which are necessary to successfully supervise and control the construction activities in accordance with the plans, specifications, and terms of contract.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>LAO PDR SOUTHEAST ASIA DISASTER RISK MANAGEMENT PROJECT: COMPONENT 1 \u00a0 Assignment Name: Consulting Firm Service for Construction Supervision in the Provinces of Luang Prabang and Borikhamxay (Reference no: AF\/C002) Name of Client: Department of Waterways, Ministry of Public Works and Transport Location: Vientiane Capital,Lao PDR Year of Completion: December2025 Project Description: In 2018, the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-6589","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/6589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6589"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/6589\/revisions"}],"predecessor-version":[{"id":6592,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/6589\/revisions\/6592"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}