{"id":7120,"date":"2026-08-26T17:07:28","date_gmt":"2026-08-26T17:07:28","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=7120"},"modified":"2026-08-26T17:07:28","modified_gmt":"2026-08-26T17:07:28","slug":"7120-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=7120","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-7121\" src=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/08\/goidertek.jpg\" alt=\"\" width=\"425\" height=\"268\" srcset=\"https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/08\/goidertek.jpg 425w, https:\/\/jpzbd.com\/wp-content\/uploads\/2026\/08\/goidertek-300x189.jpg 300w\" sizes=\"(max-width: 425px) 100vw, 425px\" \/><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\"><strong><b>Goider Tech, Adabor under Bridge<\/b><\/strong><\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\" valign=\"top\" width=\"1200\">\n<p style=\"text-align: center;\"><strong><b>Assignment Name:<\/b><\/strong><\/p>\n<p>Feasibility Study &amp; Detailed Design for Construction of R.C.C. Bridge on WASA Khal at Goider Tech, Adabor, under Dhaka North City Corporation<\/p>\n<p style=\"text-align: center;\"><strong><b>Name of Client<\/b><\/strong>:<\/p>\n<p style=\"text-align: center;\">Dhaka North City Corporation (DNCC)<\/p>\n<p style=\"text-align: center;\"><strong><b>Location:<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">Goider Tech, Adabar \u2013 Mohammudpur Link Road, Bangladesh.<strong><b>\u00a0<\/b><\/strong><\/p>\n<p style=\"text-align: center;\"><strong><b>Year of Completion:<\/b><\/strong><\/p>\n<p><strong><b>\u00a0<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">October, 2014<\/p>\n<p>&nbsp;<\/p>\n<p><strong><b>\u00a0Description of the Project:<\/b><\/strong><\/p>\n<p>The project involves the construction of a bridge at Goidertek, Adabor, to improve local connectivity and ensure uninterrupted movement across the existing water channel\/drainage passage. The scope of work includes construction of reinforced concrete substructure and superstructure, approach roads, embankment protection works, and drainage improvement facilities.<\/p>\n<p>The objective of the project is to enhance accessibility within the urban area, reduce traffic congestion on local roads, and provide a durable crossing structure capable of handling pedestrian and vehicular loads. The design and execution emphasized hydraulic adequacy, structural safety, and long-term serviceability in a densely populated urban environment.<\/p>\n<p><strong><b>Services Provided:<\/b><\/strong><\/p>\n<p>Conducting a field visit to the project site. Collecting, processing, and analyzing existing data. Collecting field data on topography, bathymetry, and Bankline, water level, discharge, and sediment;<\/p>\n<p style=\"text-align: center;\">Carryout Hydrology \u2013 Morphology Study. Review of hydraulic parameters related to the existing Bridge. Recommend the appropriate solution for the hydrological requirement of the link road. Preparation of LAP, RAP &amp; EMP.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Goider Tech, Adabor under Bridge Assignment Name: Feasibility Study &amp; Detailed Design for Construction of R.C.C. Bridge on WASA Khal at Goider Tech, Adabor, under Dhaka North City Corporation Name of Client: Dhaka North City Corporation (DNCC) Location: Goider Tech, Adabar \u2013 Mohammudpur Link Road, Bangladesh.\u00a0 Year of Completion: \u00a0 October, 2014 &nbsp; \u00a0Description of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7120","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7120","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7120"}],"version-history":[{"count":1,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7120\/revisions"}],"predecessor-version":[{"id":7122,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7120\/revisions\/7122"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}