{"id":7124,"date":"2026-08-26T17:12:26","date_gmt":"2026-08-26T17:12:26","guid":{"rendered":"https:\/\/jpzbd.com\/?page_id=7124"},"modified":"2026-08-26T17:14:43","modified_gmt":"2026-08-26T17:14:43","slug":"7124-2","status":"publish","type":"page","link":"https:\/\/jpzbd.com\/?page_id=7124","title":{"rendered":""},"content":{"rendered":"<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"1200\"><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"1200\">\n<h3 align=\"center\"><strong style=\"font-size: 1.17em;\"><strong><b>Bridge over Kaptai Lake connecting Bagachari to Naniarchor Bridge, Rangamati.<\/b><\/strong><\/strong><\/h3>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: justify;\" valign=\"top\" width=\"1200\">\n<p style=\"text-align: center;\"><strong><b>Assignment Name:<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">Bridge over Kaptai Lake connecting Bagachari to Naniarchor Bridge, Rangamati.<strong><b>\u00a0<\/b><\/strong><\/p>\n<p style=\"text-align: center;\"><strong><b>Name of Client<\/b><\/strong>:<\/p>\n<p style=\"text-align: center;\">19 ECB, Bangladesh Army<\/p>\n<p style=\"text-align: center;\"><strong><b>Location:<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">Kaptai, Rangamati, Bangladesh<\/p>\n<p style=\"text-align: center;\"><strong><b>Year of Completion:<\/b><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">2016<\/p>\n<p><strong><b>\u00a0Description of the Project:<\/b><\/strong><\/p>\n<p>The project involves the construction of a bridge over Kaptai Lake to establish a direct transport link between Bagachari and Naniarchar in Rangamati. The primary objective is to improve regional connectivity in the hill tracts, reduce travel time, and facilitate socio-economic development by ensuring reliable year-round access across the lake.<\/p>\n<p>The scope includes the construction of bridge substructure and superstructure suitable for deep-water conditions, approach roads on both sides, slope protection and bank stabilization works, and integration with the existing hill road network. Special consideration was given to challenging topographical conditions, high water depth variations, and the environmental sensitivity of the Kaptai Lake region.<\/p>\n<p><strong><b>Services Provided:<\/b><\/strong><\/p>\n<p style=\"text-align: center;\">Engineering consultancy services including review of structural design and drawings, assessment of foundation and substructure design for deep-water conditions, evaluation of geotechnical and hydrological studies, and verification of superstructure design. The services also included a review of construction methodology, environmental and slope stability considerations, quality assurance and quality control (QA\/QC), and ensuring compliance with relevant national and international bridge design standards.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Bridge over Kaptai Lake connecting Bagachari to Naniarchor Bridge, Rangamati. Assignment Name: Bridge over Kaptai Lake connecting Bagachari to Naniarchor Bridge, Rangamati.\u00a0 Name of Client: 19 ECB, Bangladesh Army Location: Kaptai, Rangamati, Bangladesh Year of Completion: &nbsp; 2016 \u00a0Description of the Project: The project involves the construction of a bridge over Kaptai Lake to establish [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7124","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7124"}],"version-history":[{"count":2,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7124\/revisions"}],"predecessor-version":[{"id":7128,"href":"https:\/\/jpzbd.com\/index.php?rest_route=\/wp\/v2\/pages\/7124\/revisions\/7128"}],"wp:attachment":[{"href":"https:\/\/jpzbd.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}