Assignment Name:
Construction of Teesta Bridge at 21st KM of Rangpur-Kurigram Road of Three Bridges Project under KFAED Assistance
Name of Client:
Roads & Highways Department (RHD), Bangladesh
Location:
Rangpur, Bangladesh
Year of Completion:
June 2005
Project of Description:
Construction of Teesta Bridge will connect Rangpur
District with Lalmonirhat & Kurigram district of Rajshahi Division. As a result Lalmonirhat and Kurigram district will be connected directly by road transportation with Dhaka city and rest of
the country through this bridge.After completion of the project the agricultural and industrial products of the local area will be easily
Services Provided:
Transported to Dhaka City & rest of the country. Hence socioeconomic development of the area will be improved. Conduct all kinds of survey work, Morphological & Hydrological study ,Traffic survey, Analysis survey data and develop design criteria. Bridge concept planning for spanning length, free Board for navigation, and structural system. Feasibility Study of different potions of Bridge system. Preparation of LAP, RAP & EMP. Preliminary Design and Cost Estimate. Comparative statement and proposed for economic alignment and Bridge structure. Modeling by pro-2006 and analysis for final Design. Preliminary BOQ, cost-estimate and working Drawings.
|