![]() |
Assesment of Existing Jetty at Mongla Cement Factory, Mongla |
|
Assignment Name: Consultancy services for Detail Design of Delivery Jetty at Mongla Cement Factory
Name of Client: Sena Kalyan Sangstha. Location: Mongla, Khulna Division, Bangladesh Year of Completion: January 2001 Project of Description: Mongla cement Factory,a subsidiary of senakallyansangstha (SKS) planned to carryout loading/unloading by constructing a delivery jetty of 42 m long and width of 10.5 m. Services Provided: Design hydro geological and embankment level, layout & alignment data. Carry out and prepare the topographical features of the project area Detail hydrological analysis of the project area. Soil investigation, Topographic Survey, EIA study etc. Final working design & drawings. Preparation of final details cost estimate, tender documents, bill of quantities. |
