Assignment Name:

Providing consultancy services regarding construction of 02-Nos Slipway each 2000 M. T. (Max) with winch, wheel house, slipway machineries, steel gangway jetty with RCC abutment including driving of 4 Nos Spud, removing & cleaning the mud/ clay/ sandy deposit from river bed by dredging & manual earth cutting of surrounding area with all other incidental works & full-time supervision for successful completion of the relevant works at Dockyard no 1&2 of BIWTC, Narayangonj.

Name of Client:

Bangladesh Inland Water Transport Corporation (BIWTC)

Location:

Narayangonj, Bangladesh

Year of Completion:

April 2022

Project of Description:

The Government of Bangladesh & BIWTC Has allocated a fund for the project called Procurement of 35 Nos. Commercial & 8 nos. Auxiliary Vessel and Construction of 2 new Slipways for BIWTC. The appointing consulting firm for providing consultancy services regarding construction of 02-Nos Slipway each 2000 M. T. (Max) with winch, wheel house, slipway machineries,steel gangway jetty with RCC abutment including driving of 4 Nos Spud, removing & cleaning the mud/clay/sandy deposit from river bed by dredging & manual earth cutting of surrounding area with all other incidental works & full time supervision for successful completion of the relevant works at Dockyard no 1&2 of BIWTC, Narayangonj. Is one of the part of this project.

Services Provided:

Survey, Investigations and Analysis, Engineering Principles, proposed Design Standards, Design details including , structural, electrical, mechanical, in/c provision of crane, sanitary design, RCC jetty, Gangway, Warehouse, Bank Protection, RCC Pavement, Utilities (water supply, sanitation and drainage system), including increase slipway Capacity 2000 MT.Winch, slipway trolley, crane, Electrical layout plan showing position of sub-station, cable duct line, flood light, tower mast and an extensive firefighting system  and another allied work detail design drawings, and Cost estimates.